50 HOUR / WEEKLY SERVICE
Perform All Daily Service Checks
Grease Arm and Front Attachment Pins
Grease every 10 hours for first 100 hours and every 50 hours
thereafter.
NOTE:
If the unit has been running or working in water the
front attachment must be greased on a 10 hour/daily
basis.
•
Position machine as shown below and lower the front
attachment to the ground and stop engine.
•
Press the grease fitting and inject grease with the grease
gun on the marked point
•
After injection, clean off the old grease that has been
purged.
Figure 38
Reference
Number
A
Arm Link Joint Pin (1 Point)
B
Link Joint Pin (2 Points)
C
Arm Bucket Joint Pin (1 Point)
Inspection, Maintenance and Adjustment
4-28
Description
D
B, E
C
A
Reference
Number
D
E
Description
Bucket Link Joint Pin (1 Point)
Bucket Cylinder Rod Pin
(1 Point)
DX140R/DX140LCR
FG014481