To Install The Positive Suction Head - Pentair NOCCHI CPS 10 Manual

Table of Contents

Advertisement

8.3 INSTALLATION OF THE POSITIVE SUCTION HEAD
1) Basin or tank
2) Float
3) Shut-off valve
4) Outlet tubing
For the installation of the positive suction head, ensure the correct inclination of the suction piping until the air present in the
tubing can exit the outlet tubing.
5) Tank/autoclave membrane (8 l/min)
6) Gauge
7) Pressure transducer
8) Flexible tube
9) Non return valve
10) Filter
11) Motor pump complete with inverter
GB
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nocchi cps 20

Table of Contents