Download Print this page

Landscape Forms GO Installation Manual

Outdoor table

Advertisement

Quick Links

GO Outdoor Table
Installation Guide
Dining height table
Standing height table
Standing height table,
Standing height table,
With canopy
Included components:
4x – hex nut,
2x - Cover plate
½-13
2x - Foot pad
2x - Side access
1x – 3M
panel
primer 94
1X – Hardware pack of grounding components, if unit is wired/solar
Tools Required:
• Safety glasses
• Hammer drill with Ø5/8" masonry bit
• 3/4" wrench
• Flat blade screwdriver
• Phillips screwdriver
• Non-marring pry bar
• Wiring connectors
• Epoxy anchoring system
• Compressed air and wire brush for clearing anchor holes
• Conduit as required by local code for Fig. 3 connection.
With canopy, solar
4x – washer,
½"
4x - Concrete
threaded
grip anchor,
rod, ½-13 x
½-13
3-1/2"
ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long-lasting finish. To protect this finish
during assembly, place unwrapped powdercoated parts on packaging foam or other non-marring surface. Do
not place or slide powdercoated parts on concrete or other hard or textured surface – this will damage the finish
causing rust to occur. Use touch-up paint on any gouges in the finish caused by assembly tools.
PROCEDURE FOR INSTALLATION:
1.
Prepare proper concrete slab as required. See Fig. 2 and Fig. 3 for conduit spacing
requirements.
Note: DO NOT DRAG unit across concrete or other rough surfaces. This could damage the finish.
Units are heavy! Dining height table weighs 345lbs, Standing height table weighs 385lbs and
Standing height with canopy weighs 755lbs. Proper lifting equipment is required. Unit ships fully
assembled, except for side access panels.
UNCRATE PRODUCT:
1.
Leave product in shipping crate and deliver close to installation site.
2.
When ready to move product into position to start installation, carefully uncrate the product
by removing the screws – marked on the crate with bright colored paint. See Fig. 1.
For SURFACE MOUNT: leave footpads installed.
1.
Set unit in position.
2.
If unit needs to be leveled, use additional foot pad material as shim, covering as much surface
area as possible to keep unit stable.
3.
Measure inside spacing as noted in Fig. 3. Adjust unit as necessary to achieve noted spacing.
Mark hole locations, see Fig. 2.
4.
Move unit to gain access to hole locations.
5.
Drill holes according to Fig. 4. Clear holes of all debris using compressed air and wire brush.
4x –
6.
Fill holes with epoxy as directed by epoxy manufacturer.
7.
Install concrete grip anchors so top of anchor is flush or just below grade.
8.
Move unit in position.
9.
Install threaded rods, washers and nuts as shown in Fig. 4. Do not tighten fully until epoxy has
cured.
10. Make wiring connections, if necessary.
11. For units that are wired/solar: install screw and star washer with grounding pigtail to side
access panel before installing panel, see Fig. 7 and Fig. 8.
12. Install side access panel. Align pins in panel with the notches along the sides of the frame.
Push panel in and then slide down to secure, see Fig. 9.
13. Install cover plate: Clean area shown in Fig. 10A. Snap 3M primer ampule and apply primer
liberally in area outlined in Fig. 10A. Allow to dry completely, approx. 5 min at room temp.
Remove red membrane from both sections of VHB tape on cover plate. Visually align the plate
in opening and press cover plate in place, see Fig. 10B. Apply pressure to both ends for
approximately 15 seconds.
Date: September 26, 2019
www.landscapeforms.com
Ph: 800.521.2546
Page 1 of 6

Advertisement

loading

Summary of Contents for Landscape Forms GO

  • Page 1 GO Outdoor Table Date: September 26, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long-lasting finish. To protect this finish during assembly, place unwrapped powdercoated parts on packaging foam or other non-marring surface. Do not place or slide powdercoated parts on concrete or other hard or textured surface –...
  • Page 2 GO Outdoor Table Date: September 26, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 CENTER TO CENTER SCREW LOCATIONS ANCHOR HOLE LOCATIONS Fig. 1 – Crated unit Fig. 2 – Conduit access location and size CONDUIT HT HEX NUT BOTTOM PLATE WASHER...
  • Page 3 GO Outdoor Table Date: September 26, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 PANEL TRACK STAR WASHER GROUNDING SCREW PIGTAIL CONDUIT PROVIDED BY INSTALLER LINE-IN WIRING Fig. 5 – Make wiring connections Fig. 7 – Connect pigtail to panel cover Fig. 6 – Make wiring connections...
  • Page 4 Ph: 800.521.2546 PROCEDURE FOR WIRING GO OUTDOOR TABLE: The GO Outdoor table with power garages or lighting ships prewired from the factory. WIRING CONNECTIONS: Note: hard-wired table must be connected to a 120v/20A max branch circuit with a GFCI breaker.
  • Page 5 GO Outdoor Table Date: September 26, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 LINE VOLTAGE, LIGHTING LINE VOLTAGE, GARAGE SOLAR, USB GARAGE SOLAR, LIGHTING Page 5 of 6...
  • Page 6 Installation Guide www.landscapeforms.com Ph: 800.521.2546 PROCEDURE FOR MAKING SOLAR CONNECTIONS: The GO Outdoor table with power garages or lighting ships prewired from the factory. Install fuse(s) on positive battery lead to charge controller. Fuses for power garages are also shipped uninstalled.