I. PRELIMINARY INFORMATION
MODEL NO.:
DATE:
II. PRE-START-UP (insert checkmark in box as each item is completed)
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
CHECK THAT INDOOR AIR FILTER IS CLEAN AND IN PLACE
VERIFY THAT UNIT INSTALLATION IS LEVEL
CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW
TIGHTNESS
CHECK PULLEY ALIGNMENT AND BELT TENSION PER TO INSTALLATION INSTRUCTIONS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS L1
INDOOR FAN AMPS
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
RETURN-AIR TEMPERATURE
COOLING SUPPLY AIR
PRESSURES
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
VERIFY THAT 3-PHASE SCROLL COMPRESSOR IS ROTATING
IN CORRECT DIRECTION.
VERIFY REFRIGERANT CHARGE USING COOLING CHARGING CHARTS ON PAGES 31 AND 32.
Copyright 1995 Carrier Corporation
START-UP CHECKLIST
(Remove and Store in Job File)
L1-L2
L2-L3
L2
PSIG
PSIG
SERIAL NO.:
TECHNICIAN:
L3-L1
L3
DB
DB
WB
DB
CL-1
CATALOG NO. BDP-3355-103