Page 1
For assistance, call 1.877.306.8930; for U.K 0800.031.4069: e-mail at info@newageproducts.com. ATTENTION : Is your cabinet damaged? STOP Need help or spare parts? For fastest service, contact NewAge Products at 1-877-306-8930; or support@newageproducts.com. Do not return to the retailer.
Page 2
Unpacking Weight Countertops Capacity • Begin by placing the package on a covered flat surface. • Remove all cardboard, foam packaging material and clear plastic bags. • Dispose / recycle all packaging materials. • Verify all the contents in the box and gather the required tools. See “Parts” and “Tools Needed” in the list below. lbs.
Page 3
Installing the Handles Removing Drawer Note: Cabinets come with handles installed on inside of drawers/doors. Press plastic triggers on underside of Extend drawer fully. drawer according to arrows in image. Align handle to holes Parts Needed. on doors or drawers. 3 x Handle 6 x Handle Bolt (M4x 30mm)
Mounting the Worktop Fastening Cabinets Note: All drawers must be removed prior to fastening cabinets together. Parts Place worktop over cabinets and lower onto cabinets. Parts Needed. Drill 3/32” pilot holes on interior wall of cabinet being fastened. Needed. 4 - #8 x 25mm 4 - #8 x 25mm screws screws...
Page 5
For assistance, call 1.877.306.8930; for U.K 0800.031.4069: e-mail at info@newageproducts.com. ATTENTION : Is your cabinet damaged? STOP Need help or spare parts? For fastest service, contact NewAge Products at 1-877-306-8930; or support@newageproducts.com. Do not return to the retailer.
Unpacking Installing the Handles Note: Cabinets come with handles installed on inside of drawers/doors. • Begin by placing the package on a covered flat surface. • Remove all cardboard, foam packaging material and clear plastic bags. Align handle to holes Parts Needed.
Mounting Cabinets Fastening Cabinets Note: Remove wine rack to make attaching cabinets easier. Drill 3/32” pilot holes Use stud finder to locate the studs Parts Needed. on interior wall of cabinet being fastened. Gather parts. and mark the wall with a pencil. 4 - #8 x 25mm screws 4 x Lag Screw...
Page 8
ON/OFF switch end. Thank you for purchasing a NewAge Product! Please give us a call or visit online if you have any questions. Call 1.877.306.8930; for UK 0800.031.4069; e-mail at info@newageproducts.com...
Page 9
Installing LED Lights for Wall Cabinets Method 1. Using double sided tape Center and press firmly 5.5”, in from provided. Attach double sided tape to walls and 7.5”, in from back wall. back of LED light bar. Peel backing off. 5.5”...
Page 10
For assistance, call 1.877.306.8930; for U.K 0800.031.4069: e-mail at info@newageproducts.com. ATTENTION : Is your cabinet damaged? STOP Need help or spare parts? For fastest service, contact NewAge Products at 1-877-306-8930; or support@newageproducts.com. Do not return to the retailer.
Unpacking Weight Countertops Parts Tall Wall Display Supplied Cabinet Capacity • Begin by placing the package on a covered (for Base cabinets only) flat surface. Threaded Caps • Remove all cardboard, foam packaging material and clear plastic bags. Threaded Washer •...
Page 12
Installing the Handles Inserting Glass Shelves Note: Cabinets come with handles installed on inside of drawers/doors. Ensure pins are installed Open cabinet doors. Install Align handle to holes Parts Needed. shelf pins at desired height. at level height. on doors or drawers. 2 x Handle 4 x Handle Bolt M4 x 22mm...
Mounting Cabinets Fastening Cabinets Note: All shelves must be removed prior to fastening cabinets together. Use stud finder to locate the studs Gather parts. Drill 3/32” pilot holes and mark the wall with a pencil. Parts Needed. on interior wall of cabinet being fastened. 4 - #8 x 25mm 4 x Lag Screw 4 x Threaded...
Page 14
ON/OFF switch end. Thank you for purchasing a NewAge Product! Please give us a call or visit online if you have any questions. Call 1.877.306.8930; for UK 0800.031.4069; e-mail at info@newageproducts.com...
Page 15
Installing LED Lights for Wall Cabinets Method 1. Using double sided tape Center and press firmly 5.5”, in from provided. Attach double sided tape to walls and 7.5”, in from back wall. back of LED light bar. Peel backing off. 5.5”...
Page 16
For assistance, call 1.877.306.8930; for U.K 0800.031.4069: e-mail at info@newageproducts.com. ATTENTION : Is your cabinet damaged? Need help or spare parts? For fastest service, STOP contact NewAge Products at 1-877-306-8930; or support@newageproducts.com. Do not return to the retailer.
Page 17
Unpacking Weight Countertops Parts Tall Wall Display Supplied Cabinet Capacity • Begin by placing the package on a covered (for Base cabinets only.) flat surface. Threaded Caps • Remove all cardboard, foam packaging material and clear plastic bags. Threaded Washer •...
Page 18
Installing the Handles Inserting Glass Shelves Note: Cabinets come with handles installed on inside of drawers/doors. Open cabinet doors. Attach Align handle to holes Ensure clips are at level height. Parts Needed. shelf clips to desired height. on doors or drawers. 2 x Handle 2 x Handle Bolt M4 x 22mm...
Page 19
Mounting Cabinets Fastening Cabinets Note: All shelves must be removed prior to fastening cabinets together. Drill 3/32” pilot holes Parts Needed. Use stud finder to locate the studs on interior wall of cabinet being fastened. Gather parts. and mark the wall with a pencil. 4 - #8 x25mm screws 4 x Lag Screw...
Page 20
ON/OFF switch end. Thank you for purchasing a NewAge Product! Please give us a call or visit online if you have any questions. Call 1.877.306.8930; for UK 0800.031.4069; e-mail at info@newageproducts.com...
Page 21
Installing LED Lights for Wall Cabinets Method 1. Using double sided tape Center and press firmly 5.5”, in from provided. Attach double sided tape to walls and 7.5”, in from back wall. back of LED light bar. Peel backing off. 5.5”...
Page 22
For assistance, call 1.877.306.8930; for U.K 0800.031.4069: e-mail at info@newageproducts.com. ATTENTION : Is your cabinet damaged? STOP Need help or spare parts? For fastest service, contact NewAge Products at 1-877-306-8930; or support@newageproducts.com. Do not return to the retailer.
Page 23
Unpacking Weight Countertops Capacity • Begin by placing the package on a covered flat surface. • Remove all cardboard, foam packaging material and clear plastic bags. • Dispose / recycle all packaging materials. • Verify all the contents in the box and gather the required tools. See “Parts” and “Tools Needed” in the list below. Parts Supplied Split lbs.
Page 24
Note: Installing Drawer Handle Installing the Handles Cabinets come with handles installed on inside of drawers/ doors. Align handle to holes Align handle to holes Parts Needed. Parts Needed. on doors or drawers. on doors or drawers. 1x Handle 2x Drawer Handle Bolt 2 x Handles 4 x Door...
Page 25
Inserting Shelf Removing Drawer Press plastic triggers on underside of Extend drawer fully. drawer according to arrows in image. Open cabinet doors. Attach Ensure clips are at level height. shelf clips to desired height. Tilt and remove shelf rack. Position over shelf supports . Lower Insert shelf at a slight angle.
Page 26
Fastening Cabinets Mounting the Worktop Note: All shelves and drawers must be removed prior to fastening cabinets together. Place worktop over cabinets and lower onto cabinets. Drill 3/32 pilot holes on interior wall of cabinet being fastened. Parts Needed. 4 - #8 x 25mm 4 - #8 x 25mm screws screws...
Page 27
To adjust the gap between the doors and frame, turn the screw (B) clockwise or counterclockwise. Thank you for purchasing a NewAge Product! Please give us a call or visit online if you have any questions. Call 1.877.306.8930; for UK 0800.031.4069; e-mail at info@newageproducts.com...
Page 28
For assistance, call 1.877.306.8930; for U.K 0800.031.4069: e-mail at info@newageproducts.com. ATTENTION : Is your cabinet damaged? STOP Need help or spare parts? For fastest service, contact NewAge Products at 1-877-306-8930; or support@newageproducts.com. Do not return to the retailer.
Page 29
Unpacking Weight Countertops Capacity • Begin by placing the package on a covered flat surface. • Remove all cardboard, foam packaging material and clear plastic bags. • Dispose / recycle all packaging materials. • Verify all the contents in the box and gather the required tools. See “Parts” and “Tools Needed” in the list below. Parts Supplied Bottle Display lbs.
Page 30
Installing the Handles Fastening Cabinets Note: Note: Cabinets come with handles installed on All shelves must be removed prior to inside of drawers/doors. fastening cabinets together. Drill 3/32” pilot holes on interior wall of cabinet being Align handle to holes Parts Needed.
Page 31
Mounting the Worktop Inserting Cabinets Shelves on an angle Open cabinet doors. Attach Parts The shelf supports are inserted into Place worktop over cabinets and lower onto cabinets. shelf clips to desired height. Needed. front and middle hole positions. 4- #8 x25mm screws Drill 3/32”...
Page 32
Inserting Cabinets Shelves Horizontal Adjusting The Door Hinges Using a Philips screwdriver, the doors can be adjusted: Open cabinet doors. Attach The shelf supports are inserted Left, right, forwards and backwards. shelf clips to desired height. into front and back holes. To adjust the doors left or right, turn the screw (A) clockwise or counterclockwise.
Page 33
Installing LED Lights for Display Cabinets cont. LED Light Guide For bottom Display cabinet drill holes on back panel following Diagram 1. The hole can be placed on either side of cabinet at point A. or B., depending on outlet location.