Page 2
The quickest method to get any parts that are missing or damaged is use our “Quick Response Center” located at: www.playnation.com/support DO NOT RETURN THIS PRODUCT TO THE RETAILER OR CONTACT THE RETAILER DIRECTLY. THE RETAILER DOES NOT STOCK COMPONENTS.
Page 3
PlayNation's Super Scoop Slides™ and Super Tube Spiral Slides™. PlayNation warrants its Super Scoop Slides™ and Super Tube Spiral Slides™ to be free from defects in workmanship and materials, under normal use and conditions, for the lifetime of the product.
Page 4
PLAYNATION WARRANTY 2018 PlayNation will, at its discretion, replace any above ground part within the stated warranty period that is defective in workmanship or materials. This decision is subject to verification of the defect, which, at PlayNation's discretion, may be accomplished by submitting photographs or by delivery of the defective part to PlayNation.
Page 5
PlayNation shall not be liable for incidental, indirect or consequential damages or injuries that result from the building and/or playing on our play sets. Adult supervision is recommended anytime a play set is being used.
Page 7
(678) 880-3300 about covered repairs, we must Mail this completed form to: have a valid Product Registration PlayNation Playsets option 3 on file. 190 Etowah Industrial Court Canton, GA 30114 Where did you buy this product?
Page 9
IMPORTANT – PLEASE READ Congratulations! You have just purchase one of the finest residential wooden swing sets available today. As with any wooden product that spends its entire life outside, in varying elements, it is important to know what to expect with your new swing set so that your family can enjoy it for many years.
Page 10
WARNING: Children must NOT use this play set until it has been completely assembled and inspected by an adult to ensure it has been properly installed PlayNation Play Systems 190 Etowah Industrial Court Canton, GA. 30114...
Page 12
TABLE OF CONTENTS Safety Guidelines………………………………………..……......Page 3-6 Leveling Fort, General Information and Definitions…………………....Pages 6-8 How to Install T-nuts, Board Identification, Predrill Lag Screw Directions and Swing Beam Loading..................Pages 9-13 Site Plan, Required Tool List and Kit Contents..........Pages 14-15 Hardware, Lumber and Accessory Checklists.………………………………..Pages 16-27 Corner Post Layout and Adding T-Nuts to Corner Posts...……..………...…..
Page 13
Safety and Maintenance Tips for Your New Play Set: NOTE: Your children’s safety is our #1 concern. Observing the following statements and warnings reduces the likelihood of serious or fatal injury. Please review these safety rules regularly with your children. •...
Page 14
Safety and Maintenance Tips for Your New Play Set: (continued) Playgrounds should be inspected on a regular basis. If any of the following conditions are noted, they should be removed, corrected, or repaired immediately to prevent injuries. • Hardware that is loose, worn or that has protrusions or projections. •...
Page 15
Play Set Surfacing Recommendations: Below are some of the recommendations that the U.S. Consumer Product Safety Commission (CPSC) offers from its Handbook for Public Playground Safety. The guide can be downloaded in full at https://www.cpsc.gov/s3fs-public/325.pdf 1. Protective Surfacing - Since almost 60% of all injuries are caused by falls to the ground, protective surfacing under and around all playground equipment is the most critical safety factor on playgrounds.
Page 16
2. Fall Zones - A fall zone, covered with a protective surfacing material, is essential under and around equipment where a child might fall. This area should be free of other equipment and obstacles onto which a child might fall. Stationary climbing equipment and slides should have a fall zone extending a Minimum of 6’...
Page 17
General Info to Review Before Installation • Depending on your experience, assembly of the playset can take as little as 6 hours up to 24 hours, depending on size, after inventory of parts; therefore, we recommend you set aside a full two days for assembly. •...
Page 18
This page is a list of definitions and explanations used throughout our instructions to aid you in the assembly of your play set. Offset Holes- Throughout the installation procedures we will refer to parts with offset holes. This refers to the orientation of the holes on the board. An offset hole is one that is closer to one side than it is the other or in other words, it is not centered on the board.
Page 19
Common Installation Practice Installing T-nuts When installing T-nuts into the wood, use a smooth faced hammer to set the face of the T-nut flush into the wood. Corner Post T-nut Insert the barrel of the T-nut into the predrilled hole. Using a smooth faced hammer, drive the T-nut until the face of the T-nut is flush to the wood.
Page 20
HOW A T-NUT WORKS THE FIRST STEP IN OUR ASSEMBLY INSTRUCTIONS IS TO INSERT T-NUTS INTO THE CORNER POSTS. A T-NUT IS A FASTENER WHICH IS THREADED ON THE INSIDE AND IT FUNCTIONS JUST LIKE A STANDARD HEX NUT. YOU INSERT THE T-NUTS INTO THE PREDRILLED HOLES IN THE CORNER POSTS.
Page 21
BOARD IDENTIFICATION 1. On the end of each board there should be a small white tag that is stapled or stuck into place. Remove the staples and/or tag after the board is installed. 2. This white identifcation tag displays the thickness, width, length and an abbreviated description of the part.
Page 22
PRE-DRILL LAG SCREW DIRECTIONS Pre-drilling holes for lag screws will make it easier to drive the screws in by hand. "Jobber" length drill bits are available in sizes that are longer than standard drill bits and those are ideal for the job. When using the drill bit you will have to "spot" drill the post and then remove the board you are attaching to finish drilling the hole.
Page 23
SWING BEAM LOADING Weight Limits for Accessories: The weight limit for a Swing Belt is 225 lbs. (Although 150lbs is the maximum recommended swinging weight capacity for the swing position.) The weight limit for a Trapeze Bar is 125 lbs. Maximum Allowable swinging weight for a three position swing: 1) The maximum allowable swinging weight at each Swing Belt position is 150 lbs.
Page 24
Please familiarize yourself with the manual, parts/components and general construction process of your new playset before getting started. SITE PLAN: 14'- 4 " " 4'-0" 8'-0" DECK 3'-1 " 1'-7 " Swing Belts (2) 3'-0" 8'-8 " DECK 12'-5 3/8" Rock Wall 1'-7 2 "...
Page 25
REQUIRED TOOL LIST: ___ Standard or Cordless Drill w/ Phillips Bit (#2 square bit provided) ___ Drill Bits 1/8”, 3/8”, 9/64”, 11/64” ___ ½” Wrench and Socket ___ ½” Deep Well Socket ___ 9/16” Deep Well Socket ___ 9/16” Wrench and Socket ___ Level ___ Tape Measure ___ Extension Cord (if using standard drill)
Page 26
#8 X 1" 11-0077 WOOD SCREW #14 X 1-1/4" 2401 HARDWARE QTY: 8 PAN HEAD PAGE 1 OF 2 SCREW 9/16/2015 JH QTY: 3 #8 X 1-1/4" WOOD SCREW QTY: 10 #8 X 1-1/2" WOOD SCREW QTY: 26 #8 X 1-3/4" WOOD SCREW QTY: 4 #8 X 2"...
Page 27
3/8 x 3-1/2" 3/8 x 2-1/2" 5/16 x 3-1/2" 11-0077 LAG SCREW LAG SCREW LAG SCREW QTY: 4 QTY: 8 QTY: 12 2401 HARDWARE PAGE 2 OF 2 9/16/2015 JH #2 SQUARE DRIVE TIP QTY:1 PLASTIC BOLT CAP 3/8 x 7" 3/8 x 6-1/2"...
Page 28
PICTURE DESCRIPTION QTY. 1 X 4 X 9" CONNECTOR BOARD 1-4-1900-CB 1 X 4 X 11" WALL PANEL BOARD 3 1-4-1100-WPB3 1 X 4 X 19" CENTER WALL PANEL BOARD 1-4-1900-CWPB 1 X 4 X 19" WALL PANEL BOARD 1 1-4-1900-WPB1 1 X 5 X 19-1/4"...
Page 29
PICTURE DESCRIPTION QTY. 5/4 X 3 X 41-7/8" DECK SPACER 125-3-4188-DS 5/4 X 4 X 23-7/8" ROCK WALL 125-4-2388-RWT 5/4 X 5 X 48" DECK BOARD 125-5-4800-DB 5/4 X 6 X 13-3/16" ROOF PEAK SUPPORT 125-6-1323-RPS 5/4 X 6 X 22" SANDBOX SEAT 125-6-2200-SS 5/4 X 6 X 23-7/8"...
Page 30
PICTURE DESCRIPTION QTY. 5/4 X 6 X 26-3/4" PANEL SLAT 125-6-2675-PS 5/4 X 6 X 28" PANEL SLAT 125-6-2800-PS 2 X 4 X 13" ANGLE SUPPORT 2-4-1300-AS 2 X 4 X 14" BOTTOM PANEL BOARD 2-4-1400-BPB 2 X 4 X 25" TARP CENTER POST 2-4-2500-TCP...
Page 31
PICTURE DESCRIPTION QTY. 2 X 4 X 36" STRINGER 2-4-3600-S 2 X 4 X 36" TARP BOARD 2-4-3600-TB 2 X 4 X 36" ROCK WALL ROPE SUPPORT 2-4-3600-RWRS 2 X 4 X 48" FRONT FACE BOARD 2-4-4800-FFB 2 X 4 X 48" PANEL BOARD 2-4-4800-PB 2 X 4 X 48"...
Page 32
PICTURE DESCRIPTION QTY. 2 X 4 X 58" CROSS MEMBER 2-4-5800-CM 2 X 6 X 13-5/8" 2-6-1363-S 2 X 6 X 36" END SANDBOX BOARD 2-6-3600-ESB 2 X 6 X 48" SANDBOX BOARD 2-6-4800-SB 2 X 6 X 48" ARCH FACE BOARD 2-6-4800-AFB 2 X 6 X 75"...
Page 33
PICTURE DESCRIPTION QTY. 3 X 3 X 96" CORNER POST 2 3-3-9600-CP2 3 X 3 X 96" CORNER POST 3 3-3-9600-CP3 3 X 3 X 96" CORNER POST 4 3-3-9600-CP4 3 X 3 X 96" SWING LEG 3-3-9600-SL 4 X 4 X 36" SWING BEAM MOUNT 4-4-3600-SBM...
Page 37
PICTURE DESCRIPTION QTY. CLIMBING ROCK (5 ROCKS ARE IN ONE BAG) ROCKS 07-0008 PLASTIC DORMER WINDOW 07-0029-G IRON DUCTILE SWING HANGER 11-4024 ROPE GREEN GREEN BRACKET 11-5013 SAFETY HANDLE (PAIR) 07-0005...
Page 38
STEP 1: CORNER POST LAYOUT 1: THIS STEP IS CRITICAL TO BUILDING THE FORT PROPERLY. IF ANY MISTAKES ARE MADE HERE, YOU WILL NEED TO DIS-ASSEMBLE AND THE RE-ASSEMBLE TO MAKE YOUR CORRECTIONS. 2: LAY OUT EACH OF THE 3 X 3 X 96" CORNER POSTS IN THE AREA YOU INTEND ON BUILDING THE FORT SIDE OF THE PLAYSET.
Page 39
STEP 2: INSERTING T-NUTS INTO CORNER POSTS 1: USE A HAMMER TO SEAT THE T-NUTS AFTER INSERTING THEM INTO THE HOLES SHOWN IN THE DIAGRAM BELOW. 2: THE BARREL OF THE T-NUT SHOULD GO IN THE HOLE FIRST. HAMMER THE T-NUT UNTIL IS FLUSH/ALMOST FLUSH TO THE CORNER POSTS.
Page 40
STEP 3: ATTACHING SANDBOX AND ROPE SUPPORT 1: THE 2 X 6 X 36" END SANDBOX BOARD (WITH FOUR PRE-DRILLED HOLES) ATTACHES TO THE BOTTOM OF THE RIGHTSIDE CORNER POSTS WITH 4" HEX BOLTS AND 5/16" WASHERS. 2: THE 2 X 4 X 36" PANEL AND DECK SUPPORT ATTACHES TO THE MIDDLE OF THE RIGHT SIDE OF THE CORNER POSTS, OFFSET HOLES DOWN, WITH 4"...
Page 41
STEP 4: ATTACHING END SANDBOX BOARD 1: THE 2 X 6 X 75" END SANDBOX BOARD (WITH SIX PRE-DRILLED HOLES) ATTACHES TO THE BOTTOM OF THE LEFT SIDE CORNER POSTS WITH 4" HEX BOLTS AND 5/16" WASHERS. 5/16"WASHER 4" HEX BOLT CORNER POST #3 2 X 6 X 75"...
Page 42
STEP 5: ATTACHING THE SANDBOX BOARDS 1: THE 2 X 6 X 48" SANDBOX BOARDS (OFFSET DOWN) ATTACH TO THE BOTTOM OF THE FRONT AND REAR CORNER POSTS WITH 4" HEX BOLTS , 3-1/2" LAG SCREWS AND 5/16" WASHERS. 2: INSTALL THE 4" HEX BOLTS AND 5/16" WASHERS FIRST. 3: SQUARE THE SANDBOX BOARD TO THE CORNER POSTS AND THEN PREDRILL 9/64"...
Page 43
STEP 6: ATTACHING TARP SUPPORT BOARDS 1: THE 2 X 4 X 48" REAR TARP SUPPORT BOARDS (WITH THE PRE-DRILLED HOLES) ATTACH TO THE TOP OF THE FRONT AND REAR CORNER POSTS WITH 4" HEX BOLTS AND 5/16 " WASHERS. THE CENTER HOLE IS OFFSET DOWN.
Page 44
STEP 7: ATTACHING ARCH FACE BOARD AND DECK SUPPORTS 1: THE 2 X 6 X 48" ARCH FACE BOARD (WITH FOUR PRE-DRILLED HOLES) ATTACHES TO THE SET OF HOLES BELOW THE TARP SUPPORT BOARD. ATTACH THE TOP ARCH FACE BOARD HOLES USING 4"...
Page 45
STEP 8: ATTACHING PANEL BOARDS 1: THE 2 X 4 X 48" PANEL BOARDS (WITH TWO PRE-DRILLED HOLES) ATTACH TO THE SET OF HOLES BELOW THE REAR TARP SUPPORT BOARD ON THE REAR OF THE FORT WITH 4" HEX BOLTS AND 5/16"...
Page 46
STEP 9: ATTACHING PANEL SUPPORTS AND SAFETY BOARD 1: THE 2 X 4 X 36" PANEL SUPPORT BOARD (TOP BOARD) SHOULD HAVE THE HOLES OFFSET UP. USE 4" HEX BOLTS AND 5/16" WASHERS TO SECURE THE BOARD TO THE CORNER POSTS. 2: THE 2 X 4 X 36"...
Page 47
STEP 10: ATTACHING FORT SIDE SUPPORTS 1: LAY THE 2 X 4 X 33-1/8"" FORT SIDE SUPPORTS ON A FLAT SURFACE WITH THE ANGLED ENDS ORIENTED THE WAY THEY WILL BE INSTALLED ONTO THE FORT. PLACE A T-NUT IN THE PRE-DRILLED HOLE ON EACH END AND SECURE WITH HAMMER.
Page 48
STEP 11: ATTACHING THE DECK BOARDS AND DECK SPACERS 1: THE 5/4 X 3 X 41-7/8" DECK SPACERS MOUNT BETWEEN THE REAR CORNER POSTS AND BETWEEN THE FRONT CORNER POSTS FLUSH TO THE EDGES. DRIVE THE 2" WOOD SCREWS THROUGH THE PREDRILLED HOLES INTO THE DECK SUPPORTS. 2: SIX 5/4 X 5 X 48"...
Page 49
STEP 12: ATTACHING THE STRINGER 1: FIND THE 2 X 4 X 36" STRINGER WITHOUT HOLES. 2: PLACE THE STRINGER UNDERNEATH THE CENTER OF THE DECK BOARDS (USE THE HOLE AT THE CENTER AS A GUIDE) MAKE SURE THE END OF THE CENTER DECK SUPPORT IS FLUSH WITH THE DECK SPACER ROUND EDGE.
Page 50
STEP 13: ATTACHING THE FRONT FACE BOARD 1: THE TOP EDGE OF THE 2 X 4 X 48" FRONT FACE BOARD WILL BE FLUSH TO THE TOP OF THE DECK SPACER. SECURE THE FRONT FACE BOARD TO THE CORNER POSTS WITH THREE 2-1/2" WOOD SCREWS PER SIDE.
Page 51
STEP 14: ATTACHING THE PANEL BOARD 1: THE 2 X 4 X 48" PANEL BOARD SHOULD HAVE THE HOLES OFFSET DOWN. MAKE THE TOP OF THE BOARD FLUSH WITH THE BOTTOM OF THE PANEL BOARD (TOP) 2: PREDRILL 9/64" HOLES 2-1/2" DEEP THROUGH THE HOLES IN THE PANEL BOARD. ATTACH THE PANEL BOARD USING 5/16 X 3-1/2"...
Page 52
STEP 15: ANGLE SUPPORTS 1: EIGHT 2 X 4 X 13" ANGLE SUPPORTS ARE MOUNTED UNDER THE DECK OF THE PLAY SET TO THE 2 X 4 X 36" DECK SUPPORTS, 2 X 4 X 48 FRONT FACE BORD AND 2 X 4 X 48" PANEL BOARD.
Page 53
STEP 16: SWING BEAM PLATE 1: LAY THE SWING BEAM MOUNT ON A FLAT SURFACE WITH THE THREE COUNTER SUNK CENTER HOLES FACING THE GROUND, THE COUNTER SUNK HOLES ON THE ENDS MUST BE FACING TOWARDS YOU. 2: PLACE THE SWING BEAM PLATE ON TOP OF THE SWING BEAM MOUNT, LINING UP PILOT HOLES.
Page 54
STEP 17: IRON DUCTILES 1: LINE UP THE HOLES OF THE IRON DUCTILES WITH THE HOLES IN THE SWING BEAM. 2: FASTEN THE IRON DUCTILES TO THE SWING BEAM USING 3/8" X 7" CARRIAGE BOLTS WITH TORQUE WASHERS ON TOP OF THE SWING BEAM, AND 3/8" WASHERS WITH 3/8" LOCK NUTS ON THE BOTTOM.
Page 55
STEP 18: ATTACHING THE SWING BEAM SUPPORT AND TRAP ARM 1: THE 4 X 4 X 36" SWING BEAM MOUNT HAS COUNTER-SUNK HOLES IN THE CENTER AND ON THE ENDS. INSTALL THE SWING BEAM MOUNT SO THAT THE COUNTER-SUNK HOLES ON EACH END OF THE BEAM FACE OUT, AND THE COUNTER-SUNK HOLES AT THE CENTER FACE DOWN.
Page 56
STEP 19: ROCK WALL 1: FIND TWO 2 X 4 X 50-1/2" ROCK WALL SIDES. 2: POSITION THE ROCK WALL SIDES SO THAT THE HOLES IN THE BOARDS ARE BOTH FACING THE SAME WAY. 3: INSERT T-NUTS INTO THE INSIDE OF THE ROCK WALL SIDES AND SET WITH A HAMMER. T-NUT DETAIL A SCALE 1 : 3...
Page 57
STEP 20: ROCK WALL 1: FIND FIVE 5/4 X 6 X 23-7/8" ROCK WALL BOARDS, AND ONE 5/4 X 6 X 23-7/8" BOTTOM ROCK WALL BOARD(1 HOLE). 2: STARTING FROM THE BOTTOM, PLACE THE BOTTOM ROCK WALL BOARD ON BOTTOM OF THE ROCK WALL SIDES, FLUSH TO THE BOTTOM OF THE ROCK WALL SIDES, AND ATTACH WITH TWO 2"...
Page 58
STEP 21: ROCK WALL 1: FIND A 5/4 X 3 X 23-7/8" ROCK WALL TOP CAP AND 5/4 X 4 X 23-7/8" ROCK WALL TOP. 2: PLACE THE 5/4 X 3 X 23-7/8" ROCK WALL TOP CAP ON ENDS OF THE ROCK WALL SIDES. FLUSH THE ROCK WALL BOARD TOP CAP TO TOP AND SIDE OF ROCK WALL SIDES, FASTEN THE ROCK WALL TOP CAP TO THE ROCK WALL SIDES WITH 2"...
Page 59
STEP 22: ROCK WALL 1: FASTEN THE 90 GREEN BRACKET TO THE ROCK WALL SIDES WITH 5/16 X 1-1/2" HEX BOLTS AND 5/16" WASHERS. 2: DO NOT FULLY TIGHTEN THE HEX BOLTS INTO THE T-NUTS AT THIS TIME. 90 GREEN BRACKET 5/16"...
Page 60
STEP 23: ROCK WALL 1: FIND FIVE ROCKS AND FIFTEEN 1-1/4" PAN HEAD SCREWS WITH WASHERS. 2: MOUNT THE ROCKS IN A STAGGERED MANNER ON THE ROCK WALL BOARDS. THREE PAN HEAD SCREWS AND WASHERS WILL SECURE EACH ROCK TO THE WALL. NOTE: THE IMAGE SHOWN BELOW IS A GENERIC ARRANGEMENT OF ROCKS ON THE ROCK WALL.
Page 61
STEP 24: ROCK WALL 1: PLACE THE ROCK WALL INTO POSITION CENTERED ON THE RIGHT SIDE ON THE FORT. THE BOTTOM EDGE OF THE GREEN BRACKETS SHOULD BE 3/4" ABOVE THE BOTTOM OF THE BOTTOM PANEL BOARD. USING THE BRACKETS AS A TEMPLATE DRILL A 3/8" HOLE THROUGH THE BOTTOM PANEL BOARD. 2: FROM THE UNDERSIDE OF THE DECK INSERT A T-NUT INTO THE BACKSIDE OF THE 3/8"...
Page 62
STEP 25: ATTACHING SWING LEGS TO BRACKET 1: PLACE THE 3 X 3 X 96" SWING LEGS FLUSH TO THE TOP OF THE SWING LEG BRACKET. 2: USING THE SWING LEG BRACKET AS A TEMPLATE, DRILL 11/64" PILOT HOLES 2-1/2" DEEP AT EACH SWING LEG BRACKET HOLE.
Page 63
STEP 26: MOUNT SWING BEAM TO SWING BEAM LEGS 1: FASTEN THE SWING BEAM TO THE SWING BEAM BRACKET USING 3/8" X 7" CARRIAGE BOLTS WITH TORQUE WASHERS ON TOP OF THE SWING BEAM, AND 3/8" LOCK NUTS WITH 3/8" WASHERS FROM UNDERNEATH.
Page 64
STEP 27: MOUNT SWING BEAM TO FORT AN EXTRA PERSON IS NEEDED FOR THIS STEP. 1: HAVE ONE PERSON WALK THE SWING BEAM OUT TO THE END ON THE FORT FROM INSIDE THE FORT WHILE THE OTHER PERSON CARRIES THE LEGS. 2: LINE UP THE PILOT HOLE ON THE END OF THE SWING BEAM WITH THE MIDDLE HOLE ON THE SWING BEAM PLATE.
Page 65
STEP 28: LEVEL SWING BEAM 1: PLACE THE LEVEL ON TOP OF THE SWING BEAM AND ADJUST THE BEAM LEGS IN OR OUT AS NEEDED TO MAKE THE SWING BEAM LEVEL. LEVEL...
Page 66
STEP 29: SWING LEG CROSS MEMBER 1: POSITION THE 2 X 4 X 58" CROSS MEMBER AGAINST THE SWING BEAM LEGS. 2: LEVEL THE CROSS MEMBER, AND MARK THROUGH THE HOLES ONTO THE LEGS. DRILL AN 11/64" HOLE AT EACH MARK 2-1/2" DEEP. 3: FASTEN THE CROSS MEMBER TO THE LEGS WITH 3/8 X 3-1/2"...
Page 67
STEP 30: BOTTOM PANEL BOARDS 2: PLACE THE 2 X 4 X 14" BOTTOM PANEL BOARD ON TOP OF THE 2 X 4 FRONT FACE BOARD AND FASTEN TO THE CORNER POSTS. DRILL A 9/64" HOLE 2-1/2" DEEP THROUGH THE BOTTOM PANEL BOARD HOLE.
Page 68
STEP 31: PANEL SLATS 1: FIND EIGHT 5/4 X 6 X 28" PANEL SLATS AND FOUR 5/4 X 6 X 26-3/4" PANEL SLATS. 2: INSTALL THE PANEL SLATS AS SHOWN BELOW. SEE DETAILS BELOW FOR MEASUREMENTS. 3: ATTACH THE PANEL SLATS TO THE FORT WITH 2" WOOD SCREWS IN THE PRE-DRILLED HOLES. 5/4 X 6 X 28"...
Page 69
STEP 32: ATTACHING CENTER POSTS 1: THE 2 X 4 X 25" CENTER POSTS WILL SECURE TO THE TARP SUPPORTS WITH A 5/16" X 2-1/2" HEX BOLT, A 5/16" WASHER AND A T-NUT. NOTE: MAKE SURE THE 2 X 4 X 25" CENTER POSTS ARE VERTICAL. 2: FASTEN EACH CENTER POST TO THE TARP SUPPORT WITH TWO 2-1/2"...
Page 70
STEP 32A: WINDOW SLATS THIS STEP WILL REQUIRE YOU TO CLIMB ONTO THE DECK. YOU WILL NEED TO INSTALL THE BOARDS ON THE INSIDE OF THE TARP SUPPORT AND ARCH FACE BOARD. 1: PLACE A 1 X 5 X 19-1/4" WALL PANEL BOARD 2 3/16"...
Page 71
STEP 32B: WINDOWS THE WINDOWS WILL BE INSTALLED ON THE OUTSIDE OF THE FRONT OF THE PLAY SET. 1: REST THE BOTTOM OF EACH WINDOW ON TOP OF THE ARCH FACE BOARD. 2: CENTER EACH WINDOW SIDE TO SIDE OVER THE OPENING. 3: ATTACH EACH WINDOW WITH FOUR #8 X 1"...
Page 72
STEP 33: TARP BOARDS 1: THE 2 X 4 X 36" (CENTER) TARP BOARD WILL ATTACH TO THE TOP OF THE TARP CENTER POSTS WITH TWO 2-1/2" WOOD SCREWS PER SIDE. 2: THE TWO 2 X 4 X 36" TARP BOARDS WILL ATTACH TO THE TOP OF THE CORNER POSTS WITH TWO 2-1/2"...
Page 73
STEP 34: SUN 1: PLACE THE WOOD SUN ON TOP OF THE TARP SUPPORTS AND LEAN IT AGAINST THE TARP CENTER POST, MAKE SURE IT IS CENTERED AND SECURE WITH TWO #8 X 2-1/2" WOOD SCREWS. REPEAT ON THE BACK SIDE OF THE FORT. 2: PLACE THE PLASTIC SUN ON TOP OF THE FRONT SUN AND SECURE WITH TWO #8 X 1-1/4"...
Page 74
STEP 35: TARP 1: PLACE THE TARP ACROSS THE TARP BOARDS WITH THE HEMS ON THE INSIDE. 2: FASTEN THE OUTSIDE CORNERS OF THE TARP TO THE SIDE OF THE TARP BOARD FIRST. ATTACH THE GROMMETS IN THE TARP TO THE TARP BOARD WITH #14 X 1-1/4" PAN HEAD SCREWS WITH 1/4"...
Page 75
STEP 36: ROOF PEAK SUPPORT 1: PLACE THE ROOF PEAK SUPPORT ON TOP OF THE FRONT TARP CENTER POSTS AND FLUSH WITH TOP TARP BOARD , MAKE SURE IT IS CENTERED AND SECURE WITH TWO #8 X 2" WOOD SCREWS. 5/4 X 6 X 13"...
Page 76
STEP 37: INSTALLING THE SLIDE 1: PLACE THE SLIDE IN THE OPENING AT THE FRONT OF THE FORT. LAY THE SLIDE ON THE DECK WITH THE LIP EXTENDING ONTO THE DECK. 2: YOU MAY PREDRILL 1/8" HOLES THROUGH THE CENTER OF EACH DIMPLE IN THE TOP OF THE SLIDE BEFORE INSTALLING THE SCREWS.
Page 77
STEP 38: CLIMBING ROPE 1: THREAD ONE END OF THE 10' ROPE THROUGH THE HOLE ABOVE THE ROCK WALL. TIE SECURE KNOT ON THE INSIDE OF THE TOP PANEL BOARD. ADD KNOTS IN ROPE TO AID IN CLIMBING. SET KNOTS ACCORDING TO YOUR CHILD'S NEEDS. 2-3 KNOTS SHOULD BE SUFFICIENT. 2: THREAD THE OTHER END OF THE ROPE THROUGH THE HOLE IN THE BOTTOM ROCK WALL BOARD.
Page 78
STEP 39: TIC TAC TOE ASSEMBLY 1: LOCATE THE 5/4 X 3 X 17-1/2" TIC TAC TOE MOUNTS. 2: FASTEN THE TIC TAC TOE MOUNTS TO THE GREEN TIC TAC TOE BRACKETS WITH THE SHORT SCREWS PROVIDED IN THE TIC TAC TOE BOX. 3: ASSEMBLE THE TIC TAC TOE ACCORDING TO THE INSTRUCTIONS IN THE BOX.
Page 79
STEP 40: MOUNTING TIC TAC TOE PANEL 1: PLACE THE TIC TAC TOE PANEL ASSEMBLY FROM THE PREVIOUS STEP ONTO THE BACK WALL. THE LOWER TIC TAC TOE MOUNT BOARD SHOULD BE 4" ABOVE THE DECK. 2: ATTACH EACH TIC TAC TOE MOUNT TO THE PANEL SLATS WITH #8 X 1-3/4 WOOD SCREWS. #8 X 1-3/4"...
Page 80
STEP 41: STEERING WHEEL 1: PLACE THE STEERING WHEEL INSERT INSIDE THE STEERING WHEEL. DRILL AN 11/64" HOLE 2" DEEP INTO THE END OF THE SWING BEAM. 2: USE THE HARDWARE INCLUDED WITH THE STEERING WHEEL TO MOUNT THE STEERING WHEEL TO THE END OF THE SWING BEAM.
Page 81
STEP 42: FLAG KITS 1: INSTALL THE FLAG KITS ON THE CORNER POSTS AT THE FRONT OF THE FORT. ATTACH THE FLAG KITS WITH THE HARDWARE PROVIDED. FLAG DETAIL A SCALE 2 : 13...
Page 82
STEP 43: NAME PLATE 1: ATTACH THE NAME PLATE TO THE MIDDLE OF THE SWING BEAM WITH TWO 1-1/4" WOOD SCREWS. ATTACH NAME PLATE HERE WITH TWO 1-1/4" WOOD SCREWS.
Page 83
STEP 44: HANGING SWINGS 1: LOCATE TWO SWING BELTS WITH CHAINS ATTACHED. 2: PLACE A CHAIN LINK ONTO EACH SWING HANGER HOOK. ADJUST EACH SWING UP OR DOWN BY PLACING THE CHAIN LINKS HIGHER ONTO THE SWING HANGER HOOK. 3: LOCATE ONE TRAPEZE BAR WITH CHAINS ATTACHED. 4: PLACE A CHAIN LINK ONTO EACH SWING HANGER HOOK.
Page 84
STEP 45: CHALKBOARD 1: ATTACH CHALKBOARD TO THE SLATS UNDER STEERING WHEEL WITH 3/4" PAN HEAD SCREWS. NOTE: CHALKBOARD COMES WITH A MAGNETIC CHALK HOLDER WHICH WILL STICK TO THE CHALKBOARD. CHALKBOARD 3/4" PAN HEADSCREW...
Page 85
STEP 46: LOONEY PERISCOPE THE PERISCOPE WILL BE MOUNTED ONTO THE REAR PANEL SLAT TO THE LEFT SIDE OF THE TIC TAC TOE. 1: FASTEN THE U-SHAPED BASE VERTICALLY ON THE REAR SLAT WITH 1-1/4" PHILIPS COUNTERSUNK HEAD SCREWS PROVIDED. 2: WHEN THE U-SHAPED BASE IS MOUNTED VERTICALLY AS SHOWN BELOW THE CHILD MAY SIMULATE THE UP AND DOWN MOVEMENT OF A REAL PERISCOPE.
Page 86
STEP 47: LOONEY TELESCOPE 1: FASTEN THE U-SHAPED BASE ON TOP OF THE TRAPEZE ARM WITH THE 1-1/4" PHILLIPS COUNTERSUNK HEAD SCREWS PROVIDED. 2: SLIDE THE BALL OF THE TELESCOPE INTO THE CHANNEL OF THE BASE. !WARNING!**DO NOT LOOK INTO SUN OR OTHER BRIGHT LIGHTS WITH TELESCOPE** 1-1/4"...
Page 87
STEP 48: GROUND STAKES 1: PLACE THE GROUND STAKES ON THE OUTSIDE OF THE SWING LEGS AS SHOWN BELOW. HAMMER A GROUND STAKE INTO THE EARTH NEXT TO EACH SWING LEG AT AN ANGLE. DO NOT HOLD THE UPPER PORTION OF THE STAKE AFTER THE FIRST COUPLE OF HITS OR IT MAY VIBRATE HARSHLY AGAINST YOUR HAND.
Page 88
STEP 49: SANDBOX SEATS 1: PLACE THE 5/4 X 6 X 22" SANDBOX SEATS ONTO THE TOP OF THE SANDBOX BOARDS AS SHOWN BELOW. 2: ATTACH THE SANDBOX SEATS TO THE SANDBOX BOARDS WITH #8 X 2" WOOD SCREWS. #8 X 2"WOOD SCREW 5/4 X 6 X 22"...
Page 89
STEP 50: SAFETY HANDLES 1: LOCATE THE SAFETY HANDLE BAG. 2: ADJUST THE SAFETY HANDLES UP OR DOWN TO SUIT THE NEEDS OF YOUR CHILD. 3: ATTACH EACH SAFETY HANDLE TO THE CORNER POST WITH TWO PAN HEAD SCREWS AND TWO WASHERS PROVIDED WITH THE SAFETY HANDLES.
Need help?
Do you have a question about the Sweetwater II 2401 and is the answer not in the manual?
Questions and answers