Preparing For Installation - Cisco SCE8000 Installing

Hide thumbs Also See for SCE8000:
Table of Contents

Advertisement

Preparing for Installation

Before working on a chassis or working near power supplies, unplug the power cord on AC units;
Caution
disconnect the power at the circuit breaker on DC units.
The plug-socket combination must be accessible at all times because it serves as the main disconnecting
Note
device.
This unit is intended for installation in restricted access areas. A restricted access area can be accessed
Note
only through the use of a special tool, lock and key, or other means of security.
Preparing for Installation
Safety
Read the installation instructions before connecting the system to the power source.
Warning
This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the
Note
absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority
or an electrician if you are uncertain that suitable grounding is available.
This product requires short-circuit (overcurrent) protection, to be provided as part of the building
Note
installation. Install only in accordance with national and local wiring regulations.
Cisco SCE8000 10GBE Installation and Configuration Guide
4-2
Preparing for Installation, page 4-2
Installing the Cisco SCE8000 Chassis in the Rack, page 4-14
Connecting the System Ground, page 4-19
Installing the Power Supplies in the Cisco SCE8000 Chassis, page 4-20
Safety, page 4-2
Site Requirements, page 4-3
Power Connection Guidelines, page 4-5
Chapter 4 Installing the Cisco SCE8000 Chassis
OL-21054-04

Advertisement

Table of Contents
loading

Table of Contents