Download Print this page
Eterna PLDGEM3 Installation Instructions

Eterna PLDGEM3 Installation Instructions

2 x 26w maintained recessed emergency downlight with drop glass

Advertisement

Quick Links

eventually, you may want to replace this product:
Regulations require the recycling of Waste from Electrical and Electronic Equipment (European "WEEE
Directive" effective August 2005—UK WEEE Regulations effective 2nd January 2007). Environment Agency
Registered Producer: WEE/GA0248QZ.
WhEn yoUR PRoDUct comEs to thE EnD of its lifE oR yoU choosE to REPlAcE it, PlEAsE REcyclE it
WhERE fAcilitiEs Exist - Do not DisPosE With hoUsEholD WAstE.
if you experience problems:
if you believe your product is defective, please return it to the place where you bought it. our technical team
will gladly advise on any Eterna lighting product, but may not be able to give specific instructions regarding
individual installations.
110713-sm
for product advice:
• T: 01933 673 144
• F: 01933 678 083
• E: sales@eterna-lighting.co.uk
page 4
Visit our website:
www.eterna-lighting.co.uk
installation instructions
a guide for qualified electricians
model:
pldGem3
2 x 26w maintained recessed
emergency downlight with drop Glass
duration: 3 hours duration in emerGency mode
these instructions are provided as a guideline to assist you.
please read these instructions before installation
and retain for future reference
pack contents:
1 x Recessed fitting
1 x Remote emergency pack
1 x Glass diffuser
1 x fixing kit
page 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the PLDGEM3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Eterna PLDGEM3

  • Page 1 Eterna lighting product, but may not be able to give specific instructions regarding individual installations.
  • Page 2 1 below. it. Eterna lighting cannot accept any liability for the lamp is illuminated. on failure of the constant 06) Disconnect fitting from emergency pack by...
  • Page 3 operation checks: lamp replacement: Periodic testing should be carried out monthly by simulating a failure of supply, causing the fitting to be 01) switch off the electricity at the mains. energised from its battery. interruption of the supply should be carried out by the operation of a local key 02) Undo the three slotted screws and remove the glass.