SUN2000-(175KTL-H0, 185KTL-INH0, 185KTL-H1)
User Manual
Figure 5-2 Crimping a DT terminal
(1) Cable
(4) DT terminal
5.3 Opening the Maintenance Compartment Door
Precautions
Procedure
Step 1 Partially loosen the two screws on the maintenance compartment door.
Step 2 Open the maintenance compartment door and install a support bar.
Issue 02 (2019-06-05)
Do not open the host panel cover of the inverter.
Before opening the maintenance compartment door, ensure that no electrical connections
are made for the inverter on the AC or DC side.
If you need to open the maintenance compartment door in rainy or snowy days, take
protective measures to prevent rain or snow entering the maintenance compartment. If
unavoidable, do not open the maintenance compartment door.
Do not leave unused screws in the maintenance compartment.
Copyright © Huawei Technologies Co., Ltd.
(2) Core
(5) Hydraulic pliers
5 Electrical Connections
(3) Heat shrink tubing
(6) Heat gun
29