Prepare Your Location; Prepare Yourself - Cisco NCS 5500 Series Hardware Installation Manual

Modular routers
Hide thumbs Also See for NCS 5500 Series:
Table of Contents

Advertisement

Prepare Your Location

Prepare Your Location

This section illustrates how the building that houses the chassis must be properly grounded to the earth ground.
Figure 3: Building with Rack Room Connected to Earth Ground

Prepare Yourself

This section illustrates how to prepare yourself before removing the chassis from the sealed antistatic bag.
The figures show how to cuff the ESD strap around the wrist and the ground cord that connects the cuff to
the ground. ESD wrist straps are the primary means of controlling static charge on personnel.
Hardware Installation Guide for Cisco NCS 5500 Series Modular Routers
24
Prepare for Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncs 5508Ncs 5504Ncs 5516

Table of Contents