Prepare Your Location; Prepare Yourself - Cisco 8011 Prepare For Installation

Table of Contents

Advertisement

Prepare for Installation
• Console cable for connecting to the console port
• Ratcheting torque screwdriver with a Phillips head that exerts up to 30-pound force per square inch (in-lb)
• Crimping tool as specified by the ground lug manufacturer
• Wire-stripping tools for stripping both 6-AWG and 14-AWG wires
• Tape measure and level

Prepare Your Location

This section illustrates how the building that houses the chassis must be properly grounded to the earth ground.
Figure 2: Building with Rack Room Connected to Earth Ground

Prepare Yourself

This section illustrates how to prepare yourself before removing the chassis from the sealed antistatic bag.
The figures show how to wear the ESD strap around the wrist and how to connect the other end of the strap
to the ground. ESD wrist straps are the primary means of controlling static charge on personnel.
Note: These images are for only representation purposes. The chassis' actual appearance and size would vary.
or 0.02-kilograms force per square millimeter (kgf/mm2) of pressure
Prepare Your Location
Prepare for Installation
7

Advertisement

Table of Contents
loading

Table of Contents