Daikin EUWY 24KBZW1 Series Service Manual page 202

Small air-cooled chillers and heat pump, r-407c
Table of Contents

Advertisement

Maintenance
1.2
Maintenance of the Main Parts
1
Preventive
maintenance
Unit Casing
3
Compressor
Evaporator and
condenser
5 5
Unit switchbox
5–4
A program of scheduled maintenance should be set up and followed. The items mentioned are to be
used as a guide and must be used in combination with sound electrical and refrigeration workmanship
to ensure trouble free operation and performance.
Follow the below instructions to check the unit casing.
Check if...
The paint of the unit casing is
intact.
All plate work is screwed down in
position.
Follow the instructions below to check the compressor:
Check crankcase heater operation. Switch of the compressor and carefully touch the crankcase
heater area by hand.
No operation can cause compressor damage when the ambient temperature reaches a low
temperature.
Follow the instructions below to check the evaporator and condenser:
Inspect the evaporator tubes or condenser plates after the first operating season. This condition
indicates the required frequency of cleaning and also whether water treatment is needed in the
chilled water circuit.
Check the air plugs and drain plugs to prevent or detect water leakage.
Check pressure-drop and water flow.
Record temperature difference between in / out and water out/ refrigerant temperature.
Inspect evaporator insulation. If damaged, repair to avoid water between insulation and evaporator
shell.
Inspect water and refrigerant connections.
If the evaporator heater-tape is installed, check operation by direct power connection and
hand-touch.
brush cleaning. Abnormal high condensing-pressures are an indication for periodic cleaning.
Follow the instructions below to check the unit switchbox:
Check all power connections for tightness.
Check compressor motor terminals.
Inspect wiring for any signs of overheating (discolouring).
Remove all dust and debris from the switchbox. Replaced coils and components should not be left
in the unit control panel.
Check all field-wired terminals.
If not, then...
Touch-up with paint.
Screw the plate work down in position.
ESIE11-02
Part 5 – Maintenance