Switching On The Appliance - BORETTI BKVD-179 Operating Instructions Manual

Hide thumbs Also See for BKVD-179:
Table of Contents

Advertisement

Available languages

Available languages

Switching On the Appliance

• Installation of the appliance and electrical
connections must be carried out by a quali-
fied technician, in accordance with the Instal-
lation Manual and local regulations.
• Installation procedure into the kitchen unit is
given in the Installation Manual. This product
is intended to be used in proper kitchen units
only.
54
• Before
switching
on, place the ap-
pliance on upright
position and wait at
least three hours
without moving the
appliance. This will
give the refrigerant
circuit time to set-
tle and operate ef-
ficiently.
• Clean the appliance
thoroughly, especially
in the interior, before
use (See Cleaning
and Maintenance).
• The appliance must be connected with a
properly installed fused socket. Power supply
(AC) and voltage at the operating point must
with the details on the name plate of the ap-
pliance (name plate is located on the inside
left of the appliance).
• Insert the plug into a socket with an effi-
cient ground connection. If the socket has no
ground contact or the plug does not match,
we suggest you to call an authorized electri-
cian for assistance.
• If the supply cord is damaged, It must be
replaced by an appointed service agent or
similarly qualifi ed person in order to avoid a
hazard
• Manufacturer is not responsible for failure
to complete the ground connection as de-
scribed in this booklet.
• There can be an odor when you first switch
on the appliance. It will disappear after the
appliance starts to cool.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brd-103

Table of Contents