Fitting The Cpm-1-70 To The Cew-1-200 - Wolf DHW Series Installation Instructions Manual

Hide thumbs Also See for DHW Series:
Table of Contents

Advertisement

Assembling the Hydrotower
3064300_201703

9. Fitting the CPM-1-70 to the CEW-1-200

The buffer cylinder CPM-1 and DHW cylinder CEW-1-200 are supplied
separately and must be assembled on-site.
1. Remove casing cover from DHW cylinder
2. Place buffer cylinder on the mounting bracket of the CEW-1 and align
them vertically.
3. Then hook the securing tabs into the back of the casing of the CPM-1-70
and secure in place as illustrated.
The casing of the CEW-1-200 bears the entire weight of the buffer
cylinder.
4. Hose connections
When combining to form a Hydrotower, the
casing cover of the CEW-1 is not required
Hose connection set BWL-1 / BWS-1
Suitable for establishing the hydraulic
connections between the CEW-1-200 and the
BWS-1-6/8/10 as a centre, or between the
CEW-1-200 and CPM-1-70 as a Hydrotower.
Insulated corrugated stainless steel hoses with
union nut fittings, flat gasket, 2 x G1½",
L = 1400/1950 mm
For other pipework:
Hose connection set BWL-1 / BWS-1
Suitable for establishing hydraulic
connections.
Corrugated stainless steel hoses with
union nut fittings, flat gasket
2 x G1½", L = 1000 mm
13

Advertisement

Table of Contents
loading

Table of Contents