Recommended minimum wall
clearances CPM-1-70
CPM-1
Wall
Hydrotower
10
6. Minimum clearances CPM-1-70
CPM-1-70 and CEW-1-200 are installed against a wall. To allow for fitting the
connections, ensure a min. clearance of 200 mm from the wall. As their body
is round, the SEW-1 and SEM-1W can be rotated, consequently no wall
clearance is required.
A clearance of 800 mm must be maintained at the front for ease of
installation, maintenance and repair.
The CPM-1-70 + CEW-1-200 Hydrotower requires a minimum room
height of 2.30 m.
When installing in combination with heat pumps, the minimum clearances
specified for the BWL-1 and BWS-1 must also be observed.
Ceiling
182 mm
CEW-1
≥ 0 mm
Wall
Service clearances
Wall
≥ 200 mm
≥ 0 mm
≥ 800 mm
3064300_201703
Wall