11'-10
10'-8
10'-2
BI-FOLD BAR WINDOW
DOUBLE DOOR
Footprint Plan
Gable End Elevation
0041_Mt_Orford_11x14_Instructions_V1.1
INSTRUCTIONS
5
" [361.5 cm]
16
1
" [326.4 cm]
2
3
" [311.8 cm]
4
EN
Mt. ORFORD
i) The door can be placed on any wall.
ii) The bay option can be added to any wall.
Eave Side Elevation
15'-9
1
" [481.3 cm]
2
Eave Side Elevation
TOLL FREE: 1-877-795-7423

Advertisement

loading
Need help?

Need help?

Do you have a question about the Mt. ORFORD and is the answer not in the manual?

Questions and answers

Summary of Contents for VISSCHER Mt. ORFORD

  • Page 1 INSTRUCTIONS Mt. ORFORD 11'-10 " [361.5 cm] 10'-8 " [326.4 cm] i) The door can be placed on any wall. 10'-2 " [311.8 cm] ii) The bay option can be added to any wall. BI-FOLD BAR WINDOW Eave Side Elevation...
  • Page 3 LADDER (8ft / 2.5m) ESTIMATED ASSEMBLY TIME: 8 HOURS IF YOU REQUIRE ASSISTANCE, OR NEED TO ORDER REPLACEMENT PARTS, CONTACT YOUR VISSCHER DEALER. FOR ADDITIONAL INFORMATION PLEASE CALL THE NUMBER BELOW. PLEASE HAVE SERIAL NUMBER READY TO ENSURE QUICK SERVICE.
  • Page 5 PAGE Mt. ORFORD CODE: 0041 CODE: 0141 PANELS / PANNEAUX 128 1 2 1296 67 7 16 1598 62 5 1599 99 7 8 1278 1545 1546 1279 TRUSS FRAME / FERME DE TOIT 1234 58 3 4 1227 1583...
  • Page 7 PAGE Mt. ORFORD CODE: 0041 CODE: 0141 METAL FLASHING 51 3 4 70 1 2 1381 1457 62 1 4 1383 1813 1384 1820 94 3 4 1388 1821 84 1 4 1393 79 5 8 87 1 4 1696...
  • Page 9: Accessories / Accessoires

    PAGE Mt. ORFORD CODE: 0041 CODE: 0141 ACCESSORIES / ACCESSOIRES CEDAR ACCENTS 1631 1045 1632 89 1 8 1275 28 3 16 1285 2069 18 1 8 1670 14 1 4 SPACERS / ESPACEURS 1671 1672 1601 24 1 16...
  • Page 11 Mt. ORFORD HARDWARE - QUINCAILLERIE CODE: 0041 CODE: 0141 180X 1 1/2" #8 FLAT HEAD (#2 ROBERTSON) ROBERTSON BIT/ EMBOUT ROBERTSON 529X 1/4" HEX HEAD BIT/ 2 1/2" #8 FLAT HEAD (#2 ROBERTSON) HEXAGONALE DE 1/4 PO 3 1/2" #10 FLAT HEAD (#2 ROBERTSON) INSTRUCTION MANUAL / 4"...
  • Page 13 STEP 1 Mt. ORFORD ATTACH ONE RIGHT TRUSS FRAME (DC 1356) AND ONE LEFT TRUSS FRAME (DC 1360) TOGETHER WITH ONE 58 3/4" WALL PLATE (DC 1227) AS SHOWN BELOW. ATTACH THE TRUSS FRAME AND WALL PLATE PIECES TOGETHER USING THIRTEEN 3 1/2" SCREWS THROUGH THE (DC 1227 ) WALL PLATE...
  • Page 14 STEP 2 Mt. ORFORD SQUARING THE TRUSS FRAME SQUARE EACH TRUSS FRAME SECTION SEPARATELY. THEN SECURE WITH ONE TRUSS FRAME BRACE (DC 1304) IN EACH CORNER AS SHOWN. SQUARE THE FRAME BY PLACING THE TRUSS FRAME BRACE INTO THE CORNER TIGHT TO INSIDE OF THE 2x6 PIECE OF THE TRUSS FRAME, AND FLUSH TO THE OUTSIDE OF THE 2x4 TOP PLATE OF THE ADJACENT SIDE.
  • Page 15 STEP 3 Mt. ORFORD WHEN BOTH OF THE TRUSS FRAME ASSEMBLIES ARE SQUARE, ATTACH THE TIE IN PLATES (DC 1234) AT EACH SIDE AS SHOWN. PLACE THE TIE IN PLATES IN BETWEEN THE TRUSS FRAME BRACES. MAKE SURE THE TOP PLATES OF EACH TRUSS FRAME ARE BUTTED TIGHT TOGETHER.
  • Page 16: Left Panel

    STEP 4 Mt. ORFORD BEGIN THE WALL CONSTRUCTION BY ASSEMBLING THE CORNERS AS SHOWN. ATTACH THE CORNERS TOGETHER USING FOUR 2 1/2" SCREWS THROUGH THE INSIDE 2x2 OF THE LEFT CORNER PANEL INTO THE 2x2 IN THE RIGHT CORNER PANEL AS SHOWN IN TOP VIEW.
  • Page 17 STEP 5 Mt. ORFORD DC-1581 DC-1583 DC-1581 DIAGRAM 2 CORNER PANELS CORNER PANELS CORNER PANELS BAY WALL FILLER DC-1336 BAY ANGLE DC-1334 BAY ANGLE DC-1334 GOING AROUND THE STRUCTURE IN A COUNTER CLOCKWISE DIRECTION, CONTINUE BUILDING THE WALLS. LOCK THE PANELS TOGETHER BY SCREWING EACH PANEL TO THE LAST WITH FOUR 2 1/2"...
  • Page 18 STEP 6 Mt. ORFORD DC-2069 INSTALL FILLER STRIPS FOR PANEL JOINTS UNWRAP THE FILLER STRIPS (DC 2069). DC-2069 SLIDE ONE FILLER STRIP IN EACH PANEL JOINT. THE FILLER STRIPS WILL SIT LOOSE IN THE JOINTS. DC-2069 DC-2069 DC-2069 DC-2069 TOLL FREE: 1-877-795-7423...
  • Page 19 STEP 7 Mt. ORFORD ASSEMBLING THE ROOF TRUSSES LEFT GUSSET DC-1667 EACH ROOF TRUSS IS MADE UP OF THREE PIECES, TWO 2x6 RAFTERS (DC 1664) AND ONE RAFTER GUSSET. THE GUSSET CREATES THE EXTENSION AT THE PEAK OF THE RIGHT GUSSET DC-1668 ROOF AS WELL AS SECURES THE TWO RAFTERS TO EACH OTHER.
  • Page 20 STEP 8 Mt. ORFORD TIP. PRE-DRILL EACH OF THE HOLES TO PREVENT THE ENDS OF THE TRUSS FRAME FROM SPLITTING WHEN PLACING THE SCREW. PLACE THE TWO OUTSIDE TRUSSES AT EITHER END OF THE ASSEMBLED TRUSS FRAME. THE PLYWOOD SIDE OF THE GUSSETS MUST FACE THE INSIDE OF THE STRUCTURE.
  • Page 21 STEP 9 Mt. ORFORD ASSEMBLY OF THE TOP RIDGE STRAPPING LINE UP THE FIVE STRAPPING PIECES (DC 1388x2, DC 1381x2, DC 1384x1), OVERLAPPING THE JOINTS AS SHOWN. THE BOTTOM 2x4 PIECE WILL OVERHANG EACH END BY 10 1/2". FASTEN THE PIECES TOGETHER USING 2 1/2" SCREWS FROM THE BACK SIDE AS SHOWN IN DETAIL 1.
  • Page 22 STEP 10 Mt. ORFORD SET THE ASSEMBLED RIDGE STRAP ON TOP OF THE TWO END RAFTERS AS SHOWN. ALIGN THE END OF THE SHORTER SECTION WITH THE OUTSIDE FACE OF THE RAFTERS AS SHOWN. THE LONGER PART WILL EXTEND PAST TO CREATE THE OVERHANG OF THE ROOF.
  • Page 23 STEP 11 Mt. ORFORD LIFT THE ENTIRE TRUSS FRAME ASSEMBLY UP ON TOP OF THE WALLS OF THE STRUCTURE. CAREFULLY SHUFFLE THE ASSEMBLY ON TOP OF THE WALL UNTIL IT IS AS CLOSE TO POSITION AS YOU CAN GET IT.
  • Page 24: Section View

    STEP 12 Mt. ORFORD USE THE BOTTOM SPACER BLOCKS (DC 1602) TO SET THE POSITION OF THE BOTTOM OF THE FIRST TWO TRUSSES FROM EACH END OF THE STRUCTURE AND THE BOTTOM CENTRE SPACER BLOCK (DC 1604) TO SET THE POSITION OF THE CENTRE TRUSS, AS SHOWN IN THE PLAN VIEW .
  • Page 25 STEP 13 Mt. ORFORD DC-1393 DC-1457 DC-1393 SECTION VIEW DC-1457 DC-1393 PLACE THE THREE RIDGE FLASHING PIECES (DC 1457) ON TOP OF THE TOP STRAPPING PLACE ONE AT EACH END AS SHOWN AND ONE PIECE OVER THE REMAINING SPACE IN THE MIDDLE. ATTACH THE FLASHING THROUGH THE FACE WITH ROOFING SCREWS AS SHOWN IN THE SECTION VIEW .
  • Page 26 STEP 14 Mt. ORFORD FOR BAY OPTIONS ONLY DETAIL 1 IF PLACING A BAY OPTION ON EITHER GABLE END WALL OF THE STRUCTURE YOU MAY MOVE ON TO PLACING THE BAY ROOF ASSEMBLY AS SHOWN IN THE NEXT STEP. NOTE: THE BAY BEAM IS NOT REQUIRED FOR THE ASSEMBLY OF A BAY ROOF ON THE GABLE END.
  • Page 27 STEP 15 Mt. ORFORD FOR BAY OPTIONS ONLY BAY ON GABLE WALL - DETAIL 1 PLACE THE BAY ROOF ASSEMBLY ON TOP OF THE ASSEMBLED BAY WALLS AS SHOWN IN THE MAIN DIAGRAM. ATTACH THE ROOF ASSEMBLY TO THE WALLS WITH 2 1/2" HEX HEAD SCREWS AS SHOWN.
  • Page 28 STEP 16 Mt. ORFORD PLACE THE GABLE END 2x4 BLOCKS (DC 1696,1697,1698,1699) AND 2x2 MIDDLE BLOCKS (DC 1700,1715) AS SHOWN. DC-1697 RIGHT ATTACH EACH BLOCK FLUSH WITH OUTSIDE OF THE WALL WITH TWO 2 1/2" SCREWS DOWN INTO THE RAFTER AS SHOWN IN THE SECTION VIEW...
  • Page 29 STEP 17 Mt. ORFORD STRAPPING ASSEMBLY ASSEMBLE STRAPPING PIECES (DC 1395, 1396). ATTACH TWO STRAPPING PIECES (DC 1395) TO ONE STRAPPING PIECE (DC 1396) TOGETHER WITH TEN 2 1/2" SCREWS AS SHOWN. BUILD THREE STRAPPING ASSEMBLIES. DC-1395 DC-1395 DC-1396 DC-1395...
  • Page 30 STEP 18 Mt. ORFORD PLACE ONE STRAPPING ASSEMBLY AT BOTH EAVE EDGES OF THE ROOF AS SHOWN BELOW. THE STRAPPING WILL OVERHANG THE END RAFTERS BY 10 1/2". EACH RAFTER HAS A MARK THAT SHOWS WHERE EACH ROW OF MARK STRAPPING IS PLACED.
  • Page 31 STEP 19 Mt. ORFORD PLACE THE 2x4 STRAPPING PIECES (DC 1383, 1384, 1388) AS SHOWN. EACH PIECE OF STRAPPING WILL OVERHANG THE END RAFTERS BY 10 1/2" AT EACH END. THE STRAPPING PIECES EACH HAVE A MARK ON ONE FACE TO DETERMINE THE POSITION TO ALLOW FOR THE 10 1/2"...
  • Page 32 STEP 20 Mt. ORFORD PEEL AND APPLY PUTTY TAPE (DC 2034) TO THE TOP OF THE RIDGE BEAM (DC 1393) PUTTY TAPE SHOULD BE APPLIED NEAR THE EDGE OF THE RIDGE DC-2034 BEAM AS SHOWN IN DETAIL 1 BE SURE TO APPLY PUTTY TAPE TO THE ENTIRE LENGTH AND TRIM TO FIT.
  • Page 33 STEP 21 Mt. ORFORD PLACE THE THIRD AND FINAL STRAPPING ASSEMBLY AT THE VERY TOP OF THE ROOF AS SHOWN. ATTACH TO THE ROOF WITH 2 1/2" SCREWS, USE TWO INTO EACH RAFTER AND ONE INTO THE RIDGE BETWEEN EACH RAFTER AS SHOWN.
  • Page 34: End View

    STEP 22 Mt. ORFORD PLACE THE WALL FASCIA BOARDS (DC 1275) AGAINST THE OUTSIDE WALLS OF EACH GABLE END OF THE STRUCTURE. PLACE THE FASCIA PIECES TIGHT TO THE UNDERSIDE OF THE ROOF STRAPPING AND TIGHT TOGETHER AT THE DC-1285 PEAK.
  • Page 35 STEP 23 Mt. ORFORD PLACE THE RAFTER TAIL PIECES (DC 1671) AS SHOWN BELOW. PLACE ONE TOP RAFTER TAIL PIECE (DC 1671) TIGHT AGAINST THE INSIDE OF THE WALL FASCIA. USING THE RAFTER TAIL SPACER BLOCK (DC 1606) PLACE FOUR RAFTER TAIL PIECES ALONG THE LENGTH OF THE ROOF.
  • Page 36 STEP 24 Mt. ORFORD thick DO NOT OVERTIGHTEN SCREWS DC-1598 DC-1599 DC-1296 DIAGRAM - 1 GABLE END PANELS ATTACH THE GABLE PANELS (DC 1598, 1599) TOGETHER WITH 2 1/2" SCREWS TO MAKE AN ASSEMBLED DC-1598, DC-1599 GABLE END.CENTRE THE GABLE END BEAM (DC 1296) ON THE UNDER-SIDE OF THE ASSEMBLED GABLE END.
  • Page 37 STEP 25 Mt. ORFORD INSTALLING THE ROOF FLASHING DC-1820 FASCIA FLASHING: PLACE THE SHORT 60" FASCIA PIECES (DC 1821) ON THE SHORT SIDE OF THE ROOF, FLUSH TO THE OUTSIDE EDGE OF THE STRAPPING AND 3 1/2" PAST THE BOTTOM STRAPPING AS SHOWN IN DETAIL 1.
  • Page 38 STEP 26 Mt. ORFORD INSTALL THE BLACK GABLE END FASCIA PIECES AT THE ENDS OF THE STRAPPING AS SHOWN. (DC 1278 & 1279) PLACE THE FASCIA PIECES SO THAT THEY PROTRUDE PAST THE STRAPPING AT BOTTOM BY 5" AS SHOWN. THE FASCIA IS TO BE FLUSH WITH THE FASCIA FLASHING (DC 1820 &...
  • Page 39 STEP 27 Mt. ORFORD PLACING THE ROOFING PANEL BEFORE PLACING THE METAL ROOFING, FASTEN THE CLOSURE TABS (DC 1834) ON THE UNDERSIDE OF THE ROOFING BEHIND THE FIRST ROW OF PUNCHED SCREW HOLES. AS SHOWN IN SECTION VIEW . 6 - CLOSURE TABS SMALL DEALER CODE: 1834 PLACE THE 60"...
  • Page 40 STEP 28 Mt. ORFORD PLACING THE ROOFING PANEL BEFORE PLACING THE METAL ROOFING, FASTEN THE CLOSURE TABS (DC 1834) ON THE UNDERSIDE OF THE ROOFING BEHIND THE FIRST ROW OF PUNCHED SCREW HOLES. AS SHOWN IN SECTION VIEW . CLOSURE TABS...
  • Page 41 STEP 29 Mt. ORFORD PEAK EDGE FLASHING PLACE THE FOUR PEAK EDGE FLASHING PIECES (DC 1813) OVER THE EXPOSED ROOFING EDGE AT THE TOP OF THE ROOF. DC-1813 PLACE THE PIECES ALONG THE ENTIRE LENGTH OF THE ROOFING OVERLAPPING THE PIECES AS NECESSARY. SECURE THE PIECES WITH 1"...
  • Page 42 STEP 30 Mt. ORFORD EACH DECORATIVE BRACE ON ALL FOUR CORNERS ARE MADE UP OF TWO PIECES. BEGIN WITH THE RAFTER TAIL SUPPORT (DC 1672). PLACE IT TIGHT AGAINST THE WALL PANEL FLUSH TO THE OUTSIDE CORNER AS SHOWN IN DIAGRAM 1. ALIGN THE TOP EDGE FLUSH WITH THE TOP OF THE EXTENSION OF THE WALL FASCIA.
  • Page 43 STEP 31 Mt. ORFORD FOR BAY OPTIONS ONLY DC-1772 PLACE THE BAY ROOF FASCIA PIECES TIGHT TO THE OUTSIDE OF THE TRUSS FRAME AND THE BOTTOM SIDE OF THE BOTTOM ROOF STRAPPING AS SHOWN. ATTACH THE FASCIA TO THE INSIDE 2x6 SUPPORT OF THE BAY ROOF WITH 2 1/2"...
  • Page 44 STEP 32 Mt. ORFORD EACH DECORATIVE CORNER IS MADE UP OF TWO PIECES THAT INTERCONNECT AT THE SQUARE CORNER OF THE GAZEBO. PLACE THE TWO PIECES TOGETHER INTERLOCKING THEM AT THE CORNER. MAKE SURE THE PIECES ARE SNUG TOGETHER AND FIT WITHIN EACH OTHER PROPERLY.
  • Page 45 STEP 33 Mt. ORFORD DETERMINE WHICH SIDE OF THE WINDOW YOU WOULD LIKE THE BI-FOLD WINDOW PANELS TO COLLAPSE TO. OPEN THE WINDOW ALL THE WAY TO ONE SIDE. WHEN THE WINDOW IS COMPLETELY OPEN, SLIDE THE NYLON STOPPERS IN THE FRAME TIGHT AGAINST THE STATIONARY SIDE OF THE WINDOW AND TIGHTEN THE SET SCREW.
  • Page 46 STEP 34 Mt. ORFORD SCREEN ROLLER SCREEN RAILS REMOVE THE BACKING STRIP FROM THE ADHESIVE TAPE. PLACE THE SCREEN REMOVE THE BACKING STRIP FROM THE ADHESIVE TAPE ON BOTH RAILS. PLACE THE ROLLER AGAINST THE ALUMINUM WINDOW AT THE VERY TOP OF THE WINDOW TOP OF THE RAIL TIGHT INTO THE THE SCREEN ROLLER.