Initial Set-Up; Coffee Brewing - Bunn Infusion Series Installation & Operating Manual

Hide thumbs Also See for Infusion Series:
Table of Contents

Advertisement

1.
Insert an empty funnel into the funnel rails of the brew
station.
2.
Place an empty server under the funnel.
3.
Connect the brewer to the power source. Make sure the
"ENABLE BREW ON/OFF" switch is ON (LED will be lit).
4.
Water will flow into the tank and stop when the tank is
filled to its capacity. Display will show PLEASE WAIT...
TANK FILLING until tank is filled with water.
5.
Wait approximately twenty-five minutes for the water in
the tank to heat to the proper temperature. Display will
show READY TO BREW...WATER TEMP: 200° when
tank is at operating temperature. Some water may drip
from the funnel during this time; this is due to expansion
and should not occur thereafter.
6.
Water volumes and flow settings have been preset at
the factory. Refer to programming manual should the
volume need to be increased or decreased.
7.
The brewer is now ready for use in accordance with the
instructions for Coffee Brewing.
1. Begin each brew cycle with a clean empty brew funnel.
2. Insert a BUNN filter into the funnel.
3. Pour the fresh coffee into the filter and level the bed of grounds by gently shaking.
4. Slide the funnel into the funnel rails until it stops.
5. Place an empty server under the funnel.
6. The "ENABLE BREW ON/OFF" switch must be ON. Select the desired batch size.
7. Momentarily press and release the assigned BREW button. There may be certain situations in which the brew
cycle will not begin when BREW is pressed:
a. SWITCH NOT ON - "ENABLE BREW ON/OFF" switch must be ON.
b. BREW TEMPERATURE TOO LOW - wait until heated, or cancel BREW LOCKOUT option.
c. DISABLED - select different brew button or batch size.
8. If none of the above messages are displayed, the display will read NOW BREWING and show the time remain-
ing in the brew cycle.
9. Following the brew will be a countdown of drip time DRIPPING which shows the time remaining until the
coffee no longer drips from the funnel tip.
10. Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops.

INITIAL SET-UP

Brew water temperature is factory set at 200° F (93.3°C)
Areas of high altitude will require lowering this tempera-
ture to prevent boiling. This chart should be used as a
guide when readjusting the brew water temperature.
Altitude
(Feet)
35665.0000A 05/04 © 2004 Bunn-O-Matic Corporation

COFFEE BREWING

Page 8
NOTICE
Boiling point
of water
°F
°C
-1000
213.8
101.0
-500
212.9
100.5
0
212.0
100.0
500
211.1
99.5
1000
210.2
99.0
1500
209.3
98.5
2000
208.4
98.0
2500
207.4
97.4
3000
206.5
96.9
3500
205.6
96.4
4000
204.7
95.9
4500
203.8
95.4
5000
202.9
94.9
5500
201.9
94.4
6000
201.0
93.9
6500
200.1
93.4
7000
199.2
92.9
7500
198.3
92.4
8000
197.4
91.9
8500
196.5
91.4
9000
195.5
90.8
9500
194.6
90.3
10000
193.7
89.8
Recommended
water temperature
°F
°C
200
93.3
200
93.3
200
93.3
200
93.3
200
93.3
200
93.3
200
93.3
200
93.3
199
92.8
198
92.2
197
91.7
196
91.1
195
90.6
195
90.6
194
90.0
193
89.4
192
88.9
191
88.3
190
87.8
189
87.2
188
86.7
187
86.1
186
85.6
48497.2 111017

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ic3 dbc

Table of Contents