Operating Controls - Bunn Infusion Series Installation & Operating Manual

Hide thumbs Also See for Infusion Series:
Table of Contents

Advertisement

A. ENABLE BREW ON/OFF SWITCH
Pressing the "ENABLE BREW ON/OFF" switch (indicator on) enables the brew circuit, and energizes the tank
refill circuit. Pressing the switch again (indicator off) stops tank refilling and brewing. Stopping a brew cycle after
it has been started will not stop the flow of water into the server until the funnel is empty. Pressing this switch
during programming of the brewer will exit the setup and return to the main screen.
B. PROGRAMMING (left)
This hidden switch can be used to scroll backwards through the function list while in programming mode.
C. BREW (A,B,C,D)
When the "ENABLE BREW ON/OFF" switch is ON and the main screen is visible, momentarily pressing and
releasing this switch will begin a brew cycle on the selected side.
D. PROGRAMMING (right)
Pressing and holding this switch allows entry into the programming menus. Pressing and releasing the switch
steps through each function screen while in the programming mode.
E. BATCH SELECTOR SWITCHES
Pressing the switch corresponding to the Half or Full batch selects the amount of product to be brewed on
the selected side. Pressing a different switch after a brew cycle has been initiated does not change the brew
batch in progress. Light indicates the selected batch to brew. Also used in programming to adjust settings on
both batch sizes.
F. FUNCTION SCREEN
This is the display which shows the various functions of the brewer and allows the programming to be ac-
complished.
G.
These are used to select options (NO/-) (DONE) (YES/+)that appear on the display during programming.

OPERATING CONTROLS

B
A
WATER TEMP: 200°
C
PROGRAMMING
F
READY TO BREW
G
Page 7
D
E
48497.2 111017

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ic3 dbc

Table of Contents