Bunn Infusion Series Installation & Operating Manual page 18

Hide thumbs Also See for Infusion Series:
Table of Contents

Advertisement

CONTAINER READY?
QUIT
Go to CAL
LP1-LP2
CALIBRATE SPRAY
PRESS BREW START
WaitingTilCycle 4
CYCLE x COMPLETE
ENTER OZ XX.X
(-)
DONE
SPRAY OZ/M:
XX.X
LP1-LP2 OZ
XX.X
CALIBRATE LP1-LP2
NO
YES
Go to
Go to CAL
DILUTION COUNTS
LP1-LP2
PROGRAMMING (cont.)
When the dispensing finishes, empty the decanter/server and place back under
brew funnel.
YES
Select YES for calibration. Selecting QUIT will skip to level probe calibration screen.
Press the "BREW START" button. Will perform the sprayhead flow-rate
calibration as well as the level probe calibration.
Brewer must not be bumped during calibration!
Machine will dispense volume between upper probe and lower probe 4 times.
(The total dispense will be about half of a decanter)
Brewer must not be bumped during calibration!
Enter volume dispensed into container.
Use the (+) to increase the numeric value or (-) to decrease.
(+)
Displays sprayhead flow-rate and volume of water between the upper and
lower level probes.
Allows you to perform calibration again if you want to verify results.
Page 18
48497.2 111017

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ic3 dbc

Table of Contents