Startup
Startup
1.
Perform Pressure Relief Procedure,
page 12.
2.
Turn pressure control to lowest
pressure.
3.
Turn ON/OFF switch to ON position.
4.
Place fluid intake in paint pail. Place
drain tube in waste pail.
16
5.
Turn pressure control to Fast Flush to
start motor. Allow paint to circulate
through drain tube for 15 seconds.
6.
Turn prime valve horizontal. Disengage
trigger lock.
7.
Hold gun against grounded metal waste
pail. Trigger gun until paint appears.
3A6491E