PRIOR TO INSTALLATION
Be sure to observe all safety precautions
• Wear goggles when using power tools.
• Observe all safety guidelines when using ladders
• Do not install your system near water or heat sources
• Wear proper work clothing, avoid loose tails and sturdy shoes
• Clean all components with a dry cloth
• Use Teachlogic accessories only
• Protect all cables from abrasion, sharp edges, and install in a tidy manner
The following Basic Tools and Supplies will be Required to Install the
System
• Safety Goggles
• Power Drill Motor & Drills
• Phillip #2 Screw Driver
• Level & Tape Measure
• Side Cutter & Scissor
• Hammer
• Staple Gun & Staples
• Plastic Cable (zip) Ties
• Plastic or Metal Raceway & Screws (If external wiring is required)
• Aviation Metal Cutters
• Ladder
• Keyhole or Drywall Saw
• Electrical Tape
• Twine or Light Weight Pull Rope
Need help?
Do you have a question about the Spectrum II and is the answer not in the manual?