4. Installing the product

The hydraulic and electrical connection and the
commissioning must be done by Grundfos service
specialists.
Wear safety shoes during transport and installation.
Wear a helmet if lifting the product higher than hip
level.
Wipe up spilled liquid immediately to avoid slipping
hazard.

4.1 Installation requirements

The operating company is obliged to prepare the installation
location according to the following requirements. Contact
Grundfos if any of these requirements cannot be met.
The installation location must be free from vibrations.
The installation location must be protected from rain, humidity,
condensation, direct sunlight and dust.
The installation location must have sufficient lighting to ensure
safe operation. Observe section
The installation location must be a solid building offering
protection from vandalism and tampering.
Observe the permissible ambient conditions. See section
12.3 Ambient
conditions.
Provide a drain for drinking water applications or if required by
local legislation.
The product must be installed vertically. It can either be
installed on a floor stand or mounted on the wall. Make sure
that the product can be installed in a height that makes the
display easy to read during operation.
428
412
352
300
Dimensions for wall mounting
Fig. 1
The sample line and liquid must meet the technical
requirements (pressure, temperature, maximum length etc.).
See section
12. Technical
data.
4
12.3.1
Lighting.
ø 6.5
12
The end of the sample line inlet (A) must be at least 20 mm
inside the pipe to ensure the most valid detection.
The sample line connection (B) must be prepared with a 1/2"
G female connector and a ball valve.
The sample line length must not exceed 5 m.
If required by local legislation, install a non-return valve in the
inlet line.
For installations with suction filter (C), install the suction filter
with sufficient distance to the walls, bottom and water surface
to avoid algae and dirt from being sucked in.
B
Installation examples
Fig. 2

4.2 Electrical connection

The hydraulic and electrical connection and the
commissioning must be done by Grundfos service
specialists.

5. Commissioning the product

The hydraulic and electrical connection and the
commissioning must be done by Grundfos service
specialists.
A
C