Manual for the
specialised craftsman
Installation
Operation
Commissioning
en
Thank you for buying this RESOL product.
Manual
Please read this manual carefully to get the best performance from this unit.
Please keep this manual carefully.
www.resol.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FlowSol C and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Resol FlowSol C

  • Page 1 FlowSol ® Manual for the specialised craftsman Installation Operation Commissioning Thank you for buying this RESOL product. Manual Please read this manual carefully to get the best performance from this unit. Please keep this manual carefully. www.resol.com...
  • Page 2: Table Of Contents

    CE mark. The Declaration of Conformity Î Arrows indicate instruction steps that should be is available upon request, please contact carried out. RESOL. Disposal Target group • Dispose of the packaging in an environmentally These instructions are exclusively addressed to au- sound manner.
  • Page 3: Overview

    FlowSol ® Overview • Integrated controller DeltaSol ® Technical data • Outstanding design Dimensions (H x W x D): approx. 417 x 374 x 179 mm (incl. insulation) • Safety assembly with safety valve and pressure gauge Distance centre: 1600 mm Distance axis / wall: 55 mm •...
  • Page 4: Mounting The Station

    Î Connect the electrical components of the solar Instructions for initial commissioning Mounting the station station: Attach the store and collector sensor and The optionally enclosed flushing and filling connect these to the controller. Plug the control- unit can either be integrated into the stati- controller ler into a socket.
  • Page 5: Flushing The Store For Initial Commissioning

    Flushing the store for initial • Open the fill and drain ball valves (3 and 5). If it is necessary to set the pressure, observe commissioning the following step: • Flush the solar thermal system using the flushing and filling station for at least 15 minutes to remove •...
  • Page 6: Emptying The Solar Thermal System

    Emptying the solar thermal system Air separator Connection The air separator (manual bled valve) is for bleeding WARNING! Always disconnect the control- WARNING! Risk of injury. The discharged fluid ler from power supply before the solar fluid in the solar thermal system. The air can have very high temperatures.
  • Page 7 Notes...
  • Page 8 As faults can never be excluded, please note: This mounting- and operation manual including all parts is copyrighted. Another use outside the copyright requires the approval of RESOL – Elektronische Rege- Your own calculations and plans, under consideration of the current standards and lungen GmbH.