With open outflow of the dosing medium or a
counter-pressure below 2 bar
Install a pressure-loading valve (7i) immediately before the
outlet or the injection unit.
A positive pressure difference of at least 2 bar must be ensured
between the counter-pressure at the injection point and the
pressure of the dosing medium at the pump suction valve.
If this cannot be ensured, install a pressure-loading valve (7i)
in the discharge line.
p  1 bar
p  2 bar
7i
Fig. 17 Installation with pressure-loading valve
To avoid the siphon effect, install a pressure-loading valve (7i)
in the discharge line and, if necessary, a solenoid valve (14i) in
the suction line.
Fig. 18 Installation to avoid the siphon effect

6.7 Tube / pipe lines

6.7.1 General
Warning
To protect the dosing system against excessive
pressure build-up, install a relief valve in the
discharge line.
Only use the prescribed line types!
All lines must be free from strain!
Avoid loops and buckles in the tubes!
Keep the suction line as short as possible to avoid
cavitation!
If necessary, use swept bends instead of elbows.
Observe the chemical manufacturer's safety
instructions when handling chemicals!
Make sure that the pump is suitable for the actual
dosing medium!
The flow must run in the opposite direction to gravity!
The resistance of the parts that come into contact
with the media depends on the media, media
temperature and operating pressure. Ensure that
Caution
parts in contact with the media are chemically
resistant to the dosing medium under operating
conditions!
22
 1 bar
p
-p
p
p
- p
>
1 bar
2
1
_
1
2
1
p
2
14i

6.8 Connecting the suction and discharge lines

Warning
All lines must be free from strain!
Only use the prescribed line types!
Connect the suction line to the suction valve.
– Install the suction line in the tank so that the foot valve
remains 5 to 10 mm above the bottom of the tank or the
possible level of sedimentation.
Connect the discharge line to the discharge valve.
Connection of hose lines
Push the hose firmly on the connection nipple and, depending
on the connection, secure using a connection counterpart or
hose clip.
Fit the gasket.
Screw the hose on the valve using the union nut.
Fig. 19 Connection of hose lines
Connection of DN 20 pipe lines
Depending on the pipe material and connection, glue the pipe
(PVC), weld it (PP, PVDF or stainless steel) or press it in
(stainless steel).
Fit the gasket.
Screw the pipe on the valve using the union nut.
Fig. 20 Connection of DN 20 pipe lines
Connection of DN 32 pipe lines
Depending on the pipe material, fit the pipe to the welding
neck flange and weld it (stainless steel) or insert it into the
headed bush and weld it (PP, PVDF).
Fig. 21 Connection of DN 32 pipe lines