Extreme Networks VSP 4900 Series Hardware Installation Manual page 76

Hide thumbs Also See for VSP 4900 Series:
Table of Contents

Advertisement

equipment rack (continued)
service access 24
space requirements 24
ESD
discharge from cable 26
system protection 23
F
fan
airflow 54
replacing 54
fan speed
VSP 4900 switch 62
fiber optic cable
bend radius 27
connecting 42
handling 27
installing 27
first switch login 44
frequency, see radio frequency interference (RFI)
front-to-back cooling 54
G
grounding
racks 24
requirements 33
wiring closet 22
H
humidity 23
I
industry standards 33
initial switch login 44
installing
1100 W AC power supply 40
2000 W AC power supply 40
715 W AC power supply 40
connecting power 42
fiber optic cable 27
optical transceivers 40
optional components 40
personnel 36
preparation 20
preparing 36
safety information 36
switches 35–37
tools 36
VIM5 module 46
J
jackets
RJ45 connector 30
VSP 4900 Series Switches: Hardware Installation Guide
L
labeling cables 25
LEDs
VSP 4900 57, 58
license options 11
local management connection 44
logging in to the switch 44
M
management port
connecting to switch 44
settings 44
VSP 4900 series 9, 10
mounting brackets
removing 49
N
network interface connections 42
O
Open Source Declaration 7, 8
operating environment requirements 22
optical cables
installing 40
optical transceivers
installing 40
optional components
installing 40
P
planning
site 20
plenum-rated cable 26
pluggable transceivers, see optical transceivers
port option cards
types 13
ports
console port settings 44
management 44
power
connecting to switch 42
requirements for cords 66
power cords
selecting 32, 71
power requirements
power supply 31
power specifications
VSP 4900 switch 62, 63
power supply unit (PSU)
1100 W AC 12, 40
2000 W AC 40
715 W AC 40
for VSP 4900 switches 62
installing 40
Index
76

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vsp4900-48p

Table of Contents