Attention: Do not remove the black hex head screws. These secure the rails that support
your controller unit.
4
≥ 18 kg (37 lbs)
CAUTION:
Use safe practices when lifting.
10 Slide the controller unit out of the rack and set it on a level, dry surface.
11 If you are shipping the controller unit to another location, replace all CRUs in the
controller unit. Carefully pack the unit in its original shipping container. You are
finished with this procedure.
12 If you are moving the controller unit to another cabinet, remove the support rails and
power cords from the old cabinet and install them in the new one.
13 To replace the controller unit and components, using the proper cautions, reverse
1 on page 25
through
a Slide the controller unit into the rack.
b Insert and tighten two of the screws that you removed in
inside front of the controller unit.
c Insert and tighten the remaining two screws that you removed in
on the inside rear of the controller unit.
d Replace all CRUs in the controller unit.
e Connect the interface cables and host Fibre Channel cables that you labeled in
Step 7 on page
26.
f Connect the remaining cables to the controller unit.
g Turn on the main circuit breakers or power switches.
h Plug in the power cords to the controller unit; then, turn on both power switches.
i Make sure that all amber fault indicator lights on the controller unit are off. If any
fault indicator lights are on, correct the problem.
j Replace the controller unit bezel.
k Check the indicator lights.
≥ 32 kg (70.5 lbs)
Step
10, as follows:
≥ 55 kg (121.2 lbs)
Step 9 on page
Step 9 on page
Chapter 2. Operating the controller unit
Step
26, on the
26,
27

Advertisement

Table of Contents
loading

Table of Contents