Usage Recommendations; Powering Off The Connectstation; Frequency Of Powering On And Off The Connectstation In Integrated Mode - Sennheiser MobileConnect User Documentation

Hide thumbs Also See for MobileConnect:
Table of Contents

Advertisement

Usage Recommendations

Powering off the ConnectStation

We recommend that the ConnectStations are powered off using the but-
ton.

Frequency of powering on and off the ConnectStation in Integrated Mode

We recommend that you power on the Connect Stations in a cluster one
by one, especially in case of cluster discovery by multicast announce-
ments.
In case of cluster discovery by DNS-SD, make sure that the configure
cluster server(s) are powered on first.
For larger clusters (3 and more ConnectStations) preferably do not fre-
quently power on and off the ConnectStations, as the cluster takes time
to form.
Usage Recommendations
75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents