Final Check; Maintenance; Packing List - TdA DKC301DC Installation And User Manual

Sliding gate operator
Table of Contents

Advertisement

DKC301DC SLIDING GATE OPERATOR INSTALLATION AND USER'S MANUAL

7. Final Check

1.
Check the power supply, grounding and wiring before running the device.
2.
Release the gear clutch with the release key to determine whether the gate can be moved
manually.
3.
If everything is in good working order, tighten the clutch with the key.
4.
Switch on the power and run the device to ensure that the gate is sliding smoothly.
5.
Adjust the magnet position until the gate opened and closed properly at the limited positions.

8. Maintenance

Keep operator clean at all times.
Ensure the operator is well earthed, and correctly terminated.
Regularly grease the wheels and axles to ensure the gate moves smoothly.

9. Packing List

After receiving the product, you should make an unpack-inspection, in which you should check whether
the product was damaged. You should find the following items in our standard packing:
No.
1
2
3
4
5
6
7
8
9
-S0011-
Item
Bolt M8X100
Nut M8
Operator base
Plate
Transmitter YKF06
Release key
Back up battery
Separate transformer
User's manual
Diagram or remark
Built-in
Optional according
to your order
9
Quantity
4 pcs
8 pcs
1 pcs
2 pcs
2 pcs
2 pcs
1 set
1 pcs
1 pcs

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents