GB
INSTALLING THE HOOD
Prior to installation, we recommend performing a short function test on the hood.
2 persons are required to install the hood.
1. Carefully lift the hood from the cardboard box.
2. Place the hood upside down on a table or on the floor. Place a cardboard layer
underneath to prevent scratching the sensitive finish.
3. The hood should be installed within a radius of approx. 0,8 m from the power outlet.
Installation sketch
16
17