True TBR Series Installation Manual page 11

Hide thumbs Also See for TBR Series:
Table of Contents

Advertisement

TRUE
TBR | TDR SERIES
CABINET SETUP
TDR ACCESSORIES
DRAFT TOWER
INSTALL DRAFT ARM
Place rubber washer over draft arm mounting holes in cabinet, put
beer line connector down through hole. Next, secure draft arm
with four screws (see images 1-6).
Insert air hose (one inch plastic tube) in draft arm, being care-
ful not to disturb insulation. Remove top cover of draft arm and
attach air hose clip to the insulating sleeve at the top of the draft
arm. Replace top cover. The air hose clip will assure that the hose
remains in proper place at all times, keeping the beer faucet cold
(see images 7-9).
(CONT.)
3
4
Thread beer line connector to draft arm and secure draft arm to cabinet
with rubber gasket under the draft arm.
7
8
Route air hose through draft tower and hang clip over beer line.
1
Draft arm install contents. Draft arm
not shown.
5
9
truemfg.com
2
Beer line connector.
6
Thread beer draft arm handle onto
the draft arm.
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents