Assembling The Device; Install Second Column Element - Seca 264 Manual

Length measuring rod
Hide thumbs Also See for 264:
Table of Contents

Advertisement

4.2 Assembling the device

Install second column
50 •
The heel stop is mounted on the first column element in
the factory.
Perform the remaining assembly with the assistance of
another person. Due to the large overall height, we
recommend placing the components on the floor and
not uprighting the device until it is fully assembled.
Proceed as follows.
To connect the column elements, proceed as follows:
element
1. Screw a threaded rod hand-tight into the elongated
nut of the first column element.
2. Slide an column element over the threaded rod
onto the first column element.
3. Position the upright connector on the second
column element so that the threaded rod protrudes
from the hole of the upright connector.
4. Screw an elongated nut onto the threaded rod.
5. Tighten the elongated nut.
ATTENTION!
Damage to device due to assembly errors
If the upright connector and cover cap are
mixed up, the device cannot be assembled as
intended.
− When installing the second column element,
ensure that you use the upright connectors
(see "Scope of supply" on page 49).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents