Ground Lug And Bracket Installation - Dell S6010-ON Installation Manual

Hide thumbs Also See for S6010-ON:
Table of Contents

Advertisement

Ground lug and bracket installation

Install the ground (GND) lug and bracket assembly, with a ground wire attached, before you install the system in a rack.
Dell supplies a kit with the following:
One 2-hole UL-certified GND lug
L-bracket
Two flat head screws to attach lug to bracket
Two pan head screws to attach assembly to chassis
You supply the following:
A wire that complies with your local electrical codes in size and color. Typically the wire is 14 AWG, colored green or green with a yellow
stripe.
An anti-oxidant compound—Dell recommends NOALOX 4 or equivalent
A crimping tool
A thread-locker compound—Dell recommends Threadlocker Blue 242 or equivalent
1
Attach the end of the ground wire to the GND lug:
a
Coat the bare end of the wire with an anti-oxidant compound.
b Insert the end of the wire into the lug.
c
To secure the connection of wire to lug, crimp the lug end.
Figure 7. Ground wire and GND lug
1
1–ground wire
2
Apply the thread-locker compound to the two flat head screws, then attach the GND lug to the L-bracket.
2
2–GND lug
S6010–ON installation
17

Advertisement

Table of Contents
loading

Table of Contents