To install the S6010–ON system, Dell recommends completing the installation procedures in the order presented in this guide.
Always handle the S6010–ON and its components with care. Avoid dropping the system or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S6010–ON and its components. As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this system.
Topics:
Unpack the S6010–ON system
Ground lug and bracket installation
Install the Dell ReadyRails System
1U two-post installation
Ground wire installation
SFP+ and QSFP+ optic installation
System power-up
Before you install an OS
Unpack the S6010–ON system
NOTE:
Before unpacking the system, inspect the container and immediately report any evidence of damage.
When unpacking the system, make sure that the following items are included:
One S6010–ON switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
Two PSUs
At least one country/region-specific AC power cord
S6010–ON Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information

Unpacking steps

1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Remove the switch from the container and place it on a secure and clean surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.
16
S6010–ON installation
S6010–ON installation