The cooler must not be exposed to flushing velocities
or debris released during flushing. It is recommended
that a suitably sized bypass and valve arrangement is
installed to allow flushing of the pipework system. The
bypass can be used during maintenance to isolate the
heat exchanger without disrupting flow to other units.
Thermometer and pressure gauge connections should
be provided on the inlet and outlet connections of each
cooler.
Drain and air vent connections should be provided at
all low and high points in the pipework to permit drain-
age of the system and to vent any air in the pipes.
Liquid systems at risk of freezing, due to low ambient
temperatures, should be protected using insulation and
heater tape and/or a suitable glycol solution. The liquid
pump(s) must also be used to ensure liquid is circu-
lated when the ambient temperature approaches freez-
ing point. Insulation should also be installed around the
cooler nozzles. Heater tape of 21 watts per meter under
the insulation is recommended, supplied independently
and controlled by an ambient temperature thermostat
set to switch on at 21°C (37°F) above the freezing tem-
perature of the liquid.
The liquid circulation pump must be controlled by the
unit. This will ensure that when the liquid temperature
falls within 2 or 3°C (3° or 5°F) of freezing the pump
will start.
The cooler is protected by heater mats under the insu-
lation which are supplied from the unit control system
power supply. During risk of freezing the control sys-
tem should be left switched on to provide the freeze
protection function unless the liquid systems have been
drained.
Any debris left in the water pipework
between the strainer and cooler could
cause serious damage to the tubes in
the cooler and must be avoided. The
installer/user must also ensure that the
quality of the water in circulation is
adequate, without any dissolved gases
which can cause oxidation of steel
parts within the cooler.
YORK INTERNATIONAL

WATER TREATMENT

The unit performance given in the Design Guide is based
on a fouling factor of 0.044 m2/hr °C/kW (0.00025 ft
°F/Btu). Dirt, scale, grease and certain types of water
treatment will adversely affect the heat exchanger sur-
faces and therefore unit performance. Foreign matter
in the water system(s) can increase the heat exchanger
pressure drop, reducing the flow rate and causing po-
tential damage to the heat exchanger tubes.
Aerated, brackish or salt water is not recommended for
use in the water system(s). YORK recommends that a
water treatment specialist is consulted to determine that
the proposed water composition will not affect the
evaporator materials of carbon steel and copper. The
pH value of the water flowing through the cooler must
be kept between 7 and 8.5.

PIPEWORK ARRANGEMENT

The following is a suggested pipework arrangement for
single unit installations. For multiple unit installations,
each unit should be piped as shown.
Isolating Valve - Normally Open
Isolating Valve - Normally Closed
Flow Regulating Valve
Flow Measurement Device
Strainer
Pressure Tapping
Flow Switch
Flanged Connection
Pipework
FIG. 5 – PIPEWORK ARRANGEMENT
FORM 201.18-NM8
2
hr
4
LD03522
31

Advertisement

Table of Contents
loading

Table of Contents