46 Electrical installation
7. Connect the phase conductors of the input cable to the L1, L2 and L3 terminals and the
phase conductors of the motor cable to the T1/U, T2/V and T3/W terminals. Connect
the brake resistor conductors (if present) to the R+ and R- terminals. Tighten the screws
to the torque given in the figure below.
L1, L2, L3, T1/U, T2/V, T3/W, R-, R+/UDC+, UDC
R4
R5
8. Reinstall the shroud on the power terminals.
9. Go to section
Connecting the control cables – ACS880-01 frames R4 and R5 (page
7
7
5
5
6
6
3.3 N·m
5.6 N·m
7
5
6
Grounding
2.9 N·m
2.9 N·m
8
47).