Installation checklist 53
Check that ...
The supply voltage matches the nominal input voltage of the drive. Check the type designation label.
The input power cable has been connected to the appropriate terminals, the phase order is right, and
the terminals have been tightened. (Pull on the conductors to check.)
Appropriate AC fuses and a main disconnector have been installed.
The motor cable has been connected to the appropriate terminals, the phase order is right, and the
terminals have been tightened. (Pull on the conductors to check.)
The brake resistor (if present) has been connected to the appropriate terminals, and the terminals have
been tightened. (Pull on the conductors to check.)
The motor cable (and brake resistor cable, if present) has been routed away from other cables.
No power factor compensation capacitors have been connected to the motor cable.
The control cables (if any) have been connected to the appropriate terminals, and the terminals have
been tightened. (Pull on the conductors to check.)
If a drive bypass connection will be used: The direct-on-line contactor of the motor and the drive output
contactor are either mechanically or electrically interlocked, ie, cannot be closed simultaneously.
There are no tools, foreign objects or dust from drilling inside the drive.
All shrouds and cover of the motor connection box are in place. Cabinet doors have been closed.
The motor and the driven equipment are ready for start.