AC power supply installation
Installing the AC power supply
Install the AC power supply to provide AC power for components.
Important:
When installing an 8000 Series chassis that requires two power supplies, turn on both power
supply units within 2 seconds of each other. If you wait longer to turn on the second power
supply, both power supplies shut down. To correct this condition, turn off both power
supplies, wait at least 30 seconds, and then turn on both power supplies again within 2
seconds.
Prerequisites
•
Risk of personal injury
Due to high-energy hazards of working with components of greater than 240 V AC,
only qualified service personnel are permitted to install and replace Ethernet Routing
Switch 8300 components.
• Remove the filler panel from the power bay if necessary. See
panel
Procedure steps
1. Grasp the handle of the new power supply.
2. Push the power supply firmly into the bay.
28
Installation — AC Power Supply
Save the power filler panel to operate the Ethernet Routing Switch 8300 Series
chassis with a power supply removed.
Danger:
on page 27.
Removing the power filler
May 2011