Setup / Mounting; Setup; Mounting / Mounting Diagram - Ecolab 00002 Operating Instructions Manual

Diaphragm-piston metering pump
Table of Contents

Advertisement

Available languages

Available languages

5

Setup / Mounting

5.1

Setup

Fig. 5.1
Pos.
Description
1
LED green (ready for use)
2
On-/Off Switch
3
Reefeding valve (connection refeeding into the container!)
4
Pump head
5
Stroke length adjustment
6
Pressure valve (connection on the metering output)
7
Suction valve (connection on the suction side)
8
Diaphragm breakage sequence
Flow direction of the metering medium
5.2

Mounting / Mounting diagram

417101338_EMP_KKS_E10
ATTENTION
-
The metering pump should be fitted in an easy-
to-access, frost-free location. The ambient
temperature must not exceed +40° C.
-
The mounting position of the device must be
horizontal.
Pos.
Description
1
Pressure relief valve
2
Metering valve / Pressure control valve
3
Suction pipe / Bottom admission valve
NOTE
Fig. 5.2
30
The installation must only be
performed by authorized
personnel and the general
guidelines and local installation
regulations must be observed!
The metering valve, pressure
control valve and pressure relief
valve can be replaced by a
multifunction valve (MFV) from
our product range, which
combines all of these
functionalities.
Rev: 09-08.12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Elados emp kks - e10 series000050000900014

Table of Contents