Fft Spectrum With -60-Dbfs Tone; Idle Noise Fft Spectrum (Btl) - Texas Instruments DRV601EVM User Manual

Evaluation module
Table of Contents

Advertisement

www.ti.com
6.5
FFT Spectrum With –60 dBFS Tone
Reference voltage is 2 Vrms. FFT size 16k.
0
-10
-20
-30
-40
-50
-60
-70
-80
-90
-100
-110
-120
-130
-140
-150
This spectrum corresponds to a dynamic range of 104-dB A-weighted. SNR measures to 104 dB
A-weighted, <12 µVrms. This noise floor is dominated by the feedback resistor network impedance level.
This can be improved by lowering the impedance level, a 10x lower impedance level lowers the noise floor
to 110 dB, <6 µVrms.
6.6
Idle Noise FFT Spectrum
Reference voltage is 2 Vrms. FFT size 16k.
0
-10
-20
-30
-40
-50
-60
-70
-80
-90
-100
-110
-120
-130
-140
-150
SLOU215 – January 2008
Submit Documentation Feedback
2k
4k
6k
8k
0
Figure 14. FFT Spectrum With –60-dBFS Tone
0
10k
20k
30k
Figure 15. Idle Noise FFT Spectrum (BTL)
10k
14k
16k
12k
f - Frequency - Hz
40k
50k
60k
70k
f - Frequency - Hz
DRV601EVM Performance
18k
22k
20k
80k
90k
DRV601EVM
13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DRV601EVM and is the answer not in the manual?

Table of Contents