Installation Preparation; Prior To Installation; Materials And Tools Required; Preparatory Measures - Martin Tracker Series Installation Manual

Conveyor belt, centring system
Table of Contents

Advertisement

4
4.1
4.1.1
4.1.2
© Martin Engineering GmbH

Installation Preparation

Prior to Installation

Materials and tools required

In addition to the standard tools, the following special instruments
may be needed for the installation and maintenance of the
product.
• Lifting device with a capacity greater than the weight of the
product to be installed (note the weight on the delivery
note).

Preparatory measures

NOTE
Pay attention to the following checks and carry them out carefully
and completely.
The freight forwarder is responsible for any transport damage!
For any damage claims, please contact the freight forwarder.
1. Check the delivery with respect to the following:
• Is the delivery complete? Is the number of pallets/cases/
containers the same as the number on the delivery note?
• Does all the transport packaging appear to be undamaged?
Is there damage which may indicate that the contained
products may be damaged?
11
M3625UK-10/15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tracker mini basicTracker heavy-dutyTracker monster

Table of Contents