Seca 645 Instruction Manual And Guarantee page 26

Hide thumbs Also See for 645:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21
– Place the display mount with the peg-
shaped end over the central column on
the railing.
– Turn the display mount until the peg
clicks into place.
– Screw the display mount tightly into pla-
ce using the Allan bolt.
Step 4: Assemble the display head
You will need the following bolts:
3 x special Allan bolt, ø 2,5 mm
– Remove the transport protection from
the display head.
– Position the display head over the dis-
play mount in such a way that the posi-
tion markers are aligned.
– Use the three Allan bolts to attach the
display head to the display mount.
26
Markers

Advertisement

Table of Contents
loading

Table of Contents