Figure 1-1 IPMI IP address displayed on the system self-check Page
Step 4
Tools and Materials
Precaution
NBU 5000 Chassis Replacement Guide v. 1.3
NetBackup 5000 Chassis Replacement v. 1.3
Record the IP Address, Subnet Mask and GateWay.
Before replacing the chassis, power off the NetBackup 5000 and
disconnect it from the power sockets and external devices.
Philips screwdriver
ESD-preventive gloves
ESD-preventive wrist strap
ESD-preventive clothes
ESD-preventive bag
Tag
PC client (Windows)
Switch
IPMITOOL software
The NetBackup 5000 is supported by two power supplies. Cut off both of
the power supplies when powering off the NetBackup 5000.
Do not pry the CPU cooling fin during operation; otherwise the CPU and
the cooling fin will be damaged.
Need help?
Do you have a question about the NetBackup 5000 and is the answer not in the manual?
Questions and answers