12. Setting up

12.1 Set-up regulations

Lift set-up is carried out by trained technicians of
the manufacturer or authorized dealer.
The standard design lift must not be positioned in
explosive areas.
Before set-up an adequate foundation must be
verified. Alternatively, this can be built according
to the foundation guidelines.
Permissible tolerances for concreted foundation
frame:
● Evenness ± 1mm
The foundations must be carried out to freeze
depth if frost or winter weather can be expected
at the location.
The technical data in chapter 3.2 must be fol-
lowed.

12.2 Electric connection

Electric connections and protective measures
must be carried out by an authorized expert ac-
cording to applicable regulations in your country.
A main fuse must be connected upstream of the
lift.
Number of
lifting
cylinders
Rated
power
[KW]
1
4.5
2
9
3
13.5
4
18
5
22.5
6
27
Local conditions apply for selecting the protective
measures.
Specified connecting cable cross sections are
reference values for maximum cable length 50m
at 30°C temperature.
"Slow-blow" fuses are to be used.
117127 ● 07/2011
● Parallelism ± 1mm
3 + N + PE
50Hz, 400V
Rated
Main
Con-
cur-
fuse
nect-
rent
[A]
ing
[A]
cable
[mm
10
16
5G2.5
20
35
5G6
30
35
5G10
40
50
5G10
45
63
5G16
60
63
5G16

12.3 Set-up remarks

28
Install bleeding filters before installing lifting
cylinders.
1.
Loosen screw (3).
2
]
2.
Open cover (2).
3.
Replace locking screw (1) with bleeding filter.
4.
Tighten cover (2) with screw (3).
5.
Remove padlock and switch on lift.
6.
Record correct installation in inspection book.
Use form "First safety check before start-up".