Page 3
Introduction ..................................3 Assumed Knowledge ..............................3 IMPORTANT – CHECK GRID CODE SETTING DURING COMMISSIONING! ..........3 When is Changing the Grid Code Required ......................4 Hardware Requirements ............................4 Grid Code Set-Up ................................4 Zeversolar Contact Details ............................5 Grid_Code_1_Phase_Inv_Rev1_20160510...
Page 4
Each Zeversolar inverter is set to a default grid code which is based on the serial number suffix that can be found on the label affixed to the inverter and its packaging, see Figure 1 below.
Page 5
Austria, Belgium, France, Greece, Northern Ireland, Poland, Republic of Ireland, Switzerland, Turkey. Please note: please refer to the Certificate Overview available from the Zeversolar website to determine in which regions the Zeversolar inverters are certified. 1.5 Hardware Requirements ...
Need help?
Do you have a question about the Zeverlution S and is the answer not in the manual?
Questions and answers