Zeversolar Zeverlution S Setup Manual

Zeversolar Zeverlution S Setup Manual

Single phase inverter power management & eeg

Advertisement

Quick Links

Power Management & EEG Setup Guide
TL
Eversol TL
S
Zeverlution
Evershine

Advertisement

Table of Contents
loading

Summary of Contents for Zeversolar Zeverlution S

  • Page 1 Power Management & EEG Setup Guide Eversol TL Zeverlution Evershine...
  • Page 2 Single Phase Inverter Power Management & EEG Setup Guide Zeversolar Contact Details  Karlos Silva – Technical Sales Manager – Europe  Address: Luxemburger Str.59, 50674, Cologne, Germany  Email: Karlos.silva@zeversolar.net  Phone: +49 221 800 51551 Revision Date Summary...
  • Page 3: Table Of Contents

    EEG – 70 % ................................. 4 Hardware Requirements ............................5 Software Requirements ............................. 5 Power Management & EEG Set-Up – Deactivating & Activating ............5 1.7.1 Checking Firmware Version ..........................5 1.7.2 Power Management & EEG Set-Up ......................... 5 Zeversolar Contact Details ............................7 Power_Management_1_Phase_Inv_Rev1_20160426...
  • Page 4: Single Phase Inverter - Power Management & Eeg Set-Up

    PV plant. It is essential to ensure that the correct grid code/safety setting has been selected for the relevant region. Each Zeversolar inverter is set to a default grid code which is based on the serial number suffix that can be found on the label affixed to the inverter and its packaging, see Figure 1 below.
  • Page 5: When Is Power Management & Eeg Required

    1.4 When is Power Management & EEG Required Please note: For countries that do not require Power Management then it is recommended that both the Power Management and EEG settings are deactivated from the front LCD panel. 1.4.1 Power Management Power management is required when the PV plant requires one or more of the following modes of operation: ...
  • Page 6: Hardware Requirements

    1.5 Hardware Requirements  Eversol TL – please note that this series of inverter has been discontinued;  Zeverlution S;  Evershine TL. 1.6 Software Requirements Refer to the table below for the firmware (FW) versions that are required for each product.
  • Page 7 Navigate to the “Normal” screen by pressing the control button on the front panel. 2. When the “Normal” screen is displayed, press and hold the control button for approximately 10 seconds. 3. To deactivate the Power Management & EEG setting, press the control button repeatedly until “ActiveP&EEG : OFF”...
  • Page 8: Zeversolar Contact Details

    1.8 Zeversolar Contact Details  Karlos Silva – Technical Sales Manager – Europe  Address: Luxemburger Str.59, 50674, Cologne, Germany  Email: Karlos.silva@zeversolar.net  Phone: +49 221 800 51551 Power_Management_1_Phase_Inv_Rev1_20160426...

This manual is also suitable for: