Summary of Contents for Zeversolar Evershine TLC

  • Page 1 Grid Code Setup Guide - Three Phase Inverter Evershine TLC Zverlution Pro 33K Eversol TLC...
  • Page 2 Three Phase Inverter Grid Code Setup Guide Zeversolar Contact Details  Karlos Silva – Technical Sales Manager – Europe  Address: Luxemburger Str.59, 50674, Cologne, Germany  Email: Karlos.silva@zeversolar.net  Phone: +49 221 800 51551 Revision Date Summary Author 04-05-2016...
  • Page 3 IMPORTANT – CHECK GRID CODE SETTING DURING COMMISSIONING! ..........4 When is Changing the Grid Code Required ......................5 Hardware Requirements ............................5 Basic & Advanced Settings ............................5 Grid Code Set-Up ................................6 Zeversolar Contact Details ............................8 Grid_Code_3_Phase_Inv_Rev1_20160510...
  • Page 4 Grid_Code_3_Phase_Inv_Rev1_20160510...
  • Page 5: Three Phase Inverter – Grid Code Set-Up

    Each Zeversolar inverter is set to a default grid code which is based on the serial number suffix that can be found on the label affixed to the inverter and its packaging, see Fehler! Verweisquelle konnte nicht gefunden werden.
  • Page 6: When Is Changing The Grid Code Required

     Austria, Belgium, France, Greece, Northern Ireland, Poland, Republic of Ireland, Switzerland, Turkey. Please note: please refer to the Certificate Overview available from the Zeversolar website to determine for which regions the Zeversolar inverters are certified. 1.5 Hardware Requirements ...
  • Page 7: Grid Code Set-Up

    1.7 Grid Code Set-Up It is necessary to ensure that the inverter has been isolated from the AC supply. To change the grid code please follow the steps outlined in Table 2. Steps Images Navigate to the “Menu” screen by pressing the Enter button on the front panel.
  • Page 8 6. On the “Safety” menu the grid code shown as “Standard” will be the first item highlighted. 7. To change the “Standard” use the arrow keys to scroll through the list of grid codes. When the correct grid code is selected, press enter...
  • Page 9: Zeversolar Contact Details

    1.8 Zeversolar Contact Details  Karlos Silva – Technical Sales Manager – Europe  Address: Luxemburger Str.59, 50674, Cologne, Germany  Email: Karlos.silva@zeversolar.net  Phone: +49 221 800 51551 Grid_Code_3_Phase_Inv_Rev1_20160510...