Preparation & Preliminary Checks - Zener ECODRIVE 8000 Installation Manual Supplement

Solar vsd
Hide thumbs Also See for ECODRIVE 8000:
Table of Contents

Advertisement

ZENER VARIDRIVE SOLUTIONS
PREPARATION & PRELIMINARY CHECKS
CAUTION!
Check PV voltage and polarity at the PV side of the Isolation switch at maximum solar intensity. Check all wiring
in particular polarity. The PV DC bus voltage must not exceed 800VDC for 8E type or 400VDC for the 8EL type
ECODRIVE. If an auxiliary AC power supply is to be used, check all wiring to the ECODRIVE and the functionality
of the control panel.
STEP 1: Prepare to apply power
1. Disable the ECODRIVE, by removing the wire in terminal 6 (ENABLE) or ensure RUN/STOP switch is set to 'STOP' (if fitted).
2. Switch the ECODRIVE to operate in local mode. If AUTO/Manual switch fitted, switch to manual or remove wire from terminal
5 (D4 = REMOTE).
3. Fit all covers and apply power to the ECODRIVE. If there is sufficient solar energy, switch on the PV array to the ECODRIVE, or
switch the AC power supply if connected.
STEP 2: Check pump rotation
Using the local control panel, press FWD and increase the speed to check pump direction. If direction is correct go to step 3. If
direction is incorrect, switch off all the supply isolators and ensure all power is removed from the ECODRIVE
the output of the ECODRIVE (not the input) and recheck the direction.
CAUTION!
Before touching and removing the cover, disconnect all supply sources and wait at least 11minutes for the
capacitors to discharge. Before touching anything inside the equipment or anything connected to the
terminals inside, check that there are no hazardous voltages present, AC or DC.
"Loading an Application"
STEP 3: Select configuration from applications menu
(This may have already been preconfigured by your ZENER Supplier/Distributor)
The following steps will load the application.
1.
As the ECODRIVE powers on, the model and software version is
displayed on the console.
2.
After the 2 seconds have elapsed a meter display is revealed
(assuming no application is loaded).
3.
Press ESC to access the menu.
4.
Press ENTER to access the A00 DEFAULT MENU.
5.
Press DOWN until 'Application: <NONE>''is displayed and press
ENTER.
6.
Press DOWN to the desired application: such as "TANK solar" press
ENTER to select.
7.
Press ESC until asked to SAVE, Press ENTER and wait until completed.
8.
THE ECODRIVE has now been loaded with an application – go to the
appropriate setup guide. (See Page 28 )
IMPORTANT NOTE: To change 'Applications' you must restore defaults and then load the desired application.
IM00130
ZENER ECODRIVE® 8000
P a g e
| 25
.
Switch 2 wires on
R40
Ver 5.2.
A00 DEFAULT
Application:
TANK Solar
20/07/2018 3:59 PM