  • Page 1 RDCVv04EN DCV Dry Condenser DCV-AD TrilliumSeries Condenser RIGGING AND INSTALLATION INSTRUCTIONS...
  • Page 2 Be sure to have a copy of the unit certified drawing available for reference. If you do not have a copy of this drawing or if you need additional information about this unit, contact the local BAC Balticare representative. His name and phone number can be found on the BAC website: www.BaltimoreAircoil.eu.
  • Page 3: Table Of Contents

    Table of Contents RIGGING AND INSTALLATION INSTRUCTIONS General Information About Engineering and Application Practices Shipping Inspection Before Rigging Unit Weights Anchoring Leveling Freeze Protection Safety Precautions Warranties Construction Details Rigging Unloading of Equipment Rigging Method Installation Adiabatic Pre-Cooler 1. Removal of Crating 2.
  • Page 4: General Information

    Shipping BAC equipment is factory assembled to assure uniform quality and minimum field assembly. The adiabatic pre-cooler sections of the TrilliumSeries equipment are shipped separately. Refer to below table for number of adiabatic pre-cooler sections per model.
  • Page 5: Unit Weights

    The water immersion sensor is shipped loose and stored inside the electrical cabinet for installation on site. Unit Weights Before rigging any BAC equipment, the weight of each section should be verified on the unit certified drawing. These weights are approximate only and should be confirmed by weighing before lifting when available hoisting capacity provides little margin for safety.
  • Page 6: Safety Precautions

    Since the equipment operates at variable speeds, steps must be taken to avid operating at or near the installation's "critical speed"; For more information consult your local BAC Balticare representative. ELECTRICAL SAFETY Each fan associated with this equipment should be installed with a lockable disconnect switch located within sight of the equipment. No service work should be performed on or near the fans unless motors are electrically isolated.
  • Page 7: Warranties

    FAILURE TO USE DESIGNATED LIFTING POINTS CAN RESULT IN A DROPPED LOAD CAUSING SEVERE INJURY, DEATH AND/OR PROPERTY DAMAGE. LIFTS MUST BE PERFORMED BY QUALIFIED RIGGERS FOLLOWING BAC PUBLISHED RIGGING INSTRUCTIONS AND GENERALLY ACCEPTED LIFTING PRACTICES; THE USE OF SUPPLEMENTAL SAFETY SLINGS MAY ALSO BE REQUIRED IF THE LIFT CIRCUMSTANCES WARRANT ITS USE, AS DETERMINED BY THE RIGGING CONTRACTOR.
  • Page 8: Construction Details

    DCV-AD CONSTRUCTION DETAILS DCV V-Type Dry Condenser DCV-AD TrilliumSeries Condenser 1. Heat exchanger (not shown) 2. Coil Headers (not shown) 3. Casing 4. Fans 5. Pre-cooler Media 6. Pre-Cooler Solenoid Valve and Water Filter 7. Pre-Cooler Drains 8. Pre-Cooler flow Valve/Meter 9.
  • Page 9 Details 2 Construction Details 2 Construction Details W W W . B A L T I M O R E A I R C O I L . E U...
  • Page 10: Rigging

    DCV-AD RIGGING Unloading of Equipment 1. The equipment arrives on site by truck. It is recommended to unload the unit with a crane. The Adiabatic Pre-Cooling Sections for the TrilliumSeries are crated separately. A forklift should be used for unloading of the crate with Adiabatic Pre-Coolers. A crane must always be used to unload the unit from the truck.
  • Page 11: Rigging Method

    Rigging Method To avoid damage during hoisting, a spreader beam should be used and the angles shown in the diagrams below must be observed. END VIEW End view SIDE VIEW 4-fan unit 6-fan unit 3 Rigging 3 Rigging W W W . B A L T I M O R E A I R C O I L . E U...
  • Page 12 8-fan unit 10-fan unit 12-fan unit W W W . B A L T I M O R E A I R C O I L . E U...
  • Page 13: Installation Adiabatic Pre-Cooler

    DCV-AD INSTALLATION ADIABATIC PRE-COOLER 1. Removal of Crating Remove crating of Pre-Cooling Sections of the TrilliumSeries Coolers. Crate with adiabatic pre-cooling sections Front view after crate removal 4 Installation Adiabatic Pre-Cooler 4 Installation Adiabatic Pre-Cooler W W W . B A L T I M O R E A I R C O I L . E U...
  • Page 14: Removal Of Pre-Cooler Media

    Side view after crate removal 2. Removal of Pre-Cooler Media The pre-cooler media have been placed inside the stainless steel frames for shipment and need to be removed before installation of the empty pre-cooling frames on the dry cooler. Remove the pre-cooler media as follows: Removal of top plate Removal of green water distribution pads W W W .
  • Page 15: Attachment Of Pre-Cooler Frame

    Removal of pre-cooler media Empty pre-cooler frame 3. Attachment of Pre-Cooler Frame Attach the empty pre-cooler frames to the dry unit, using the stainless steel hardware supplied. Place the different pre-cooler frames such that the water distribution piping between sections can be connected, and the copper water piping installed on the unit connects to the water flow meter of the pre-cooling sections.
  • Page 16 Attaching Pre-Cooler frame to dry unit with stainless steel hardware. Stainless steel bolts and nuts connecting Pre-Cooler frame to dry unit flanges. Water distribution piping of Pre-Cooler sections interconnection. Rubber sleeve used to connect with water distribution header of next section. W W W .
  • Page 17: Gutter System Connection

    4. Gutter System Connection Interconnect gutter system of side-by side pre-cooler sections using the threaded PVC fittings with counter ring. Gutter with interconnecting PVC fitting - side 1 Gutter with interconnecting PVC fitting - side 2 5. Interconnection of Pre Cooler sections Interconnect pre-cooler sections with the stainless steel connection plates.
  • Page 18: Re-Installation Of The Pre-Cooler Media

    Side-by-side pre-cooler frames connected with stainless steel connection plates. 6. Re-Installation of the Pre-Cooler Media Re-install the pre-cooler medium (2) and the water distribution pads (1) placed on top of the pre-cooler medium. Re- install the top plate covering the water distribution section. Installation of Pre-Cooler Medium Caution THE PRE-COOLING MEDIA HAS A FRONT SIDE AND A BACK SIDE AND NEEDS TO BE (RE)
  • Page 19: Connection Of Water Inlet

    Continue with installation of Pre-Cooler Media Re-installation of Top Plate. 7. Connection of Water Inlet At water inlet side, connect the flexible water hose to the copper water distribution piping pre-installed on the unit. Connection of Pre-Cooler water inlet to the pre-installed copper water distribution piping. 8.
  • Page 20 The surplus of water distributed over the Adiabatic Pre-Cooling media during adiabatic operation is collected into a gutter and drained to the sewer via one or two different drains per pre-cooler side. 8-fan, 10-fan and 12-fan coolers are equipped with 4 separately shipped Adiabatic Pre-Cooling sections, 2 per side. Each Adiabatic pre-cooler section is equipped with a separate bottom drain guaranteeing full emptying and drying of the gutter system after each adiabatic cycle.
  • Page 21: Start-Up And Commissioning

    BAC Balticare representative for assistance. PURGE REQUIREMENTS The installer of BAC condensers and closed circuit cooling towers must provide a proper system purging, which enables purging air from the coils prior to operation. Entrained air can obstruct free drainage of cooling medium and reduce thermal capacity.
  • Page 22: Trilliumseries Condensers - General

    TrilliumSeries Condensers - General ADIABATIC PRE-COOLER WATER FLOW A minimum water flow must be distributed over the Adiabatic Pre-Cooler as per Minimum Water Flow Rates. (See table "Minimum Recommended Adiabatic Pre-Cooler Water Flow Rates", section "About Water Care" on page 1) The water flow will depend on the supply water pressure, and can be set by adjusting the adjustment screw on the water flow valve on the flow meter (See Figure below).
  • Page 23 Control Panel with Variable Frequency Drive The adiabatic pre-cooling will be activated and stopped on the basis of a pre-programmed logical combination of the fan speed and the ambient temperature (release set-point). Default settings will not activate adiabatic pre- cooling unless all fans are running at maximum permissible speed and the dry-to-adiabatic release set-point is reached.
  • Page 24 2. Turn the main power switch Q0 (and the “Start” button of the General Contactor Relay K0 if ordered as option) “on” to power the inverter; its LCP (Local Control Panel) is energised. Turn powerswitch QBO to position I, and the fans are powered by the inverter (in position “II”...
  • Page 25 LEGEND Main Power Switch Magnetic Main Power Circuit Breaker Auxiliary Fuses - Transformer T1 Auxiliary Fuses - 230 V supply Auxiliary Fuses - 24 V supply Auxiliary Fuses – Solenoid valves Transformer 400/ 0 – 230 - 24 V F1, F2, F3, etc. Circuit Breakers Emergency Stop Switch Indicating Lamp...
  • Page 26: Further Assistance & Information

    For more details, contact BAC Balticare at www.balticare.com or you can also contact your local BAC representative for further information and specific assistance at www.BaltimoreAircoil.eu.
  • Page 27 COOLING TOWERS CLOSED CIRCUIT COOLING TOWERS ICE THERMAL STORAGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS & SERVICES www.BaltimoreAircoil.eu info@BaltimoreAircoil.eu www.balticare.com info@balticare.com Please refer to our website for local contact details. Industriepark - Zone A, B-2220 Heist-op-den-Berg, Belgium © Baltimore Aircoil International nv...

Table of Contents