About Rigging and Installation
The BAC equipment should be rigged and installed as outlined in this bulletin.
These procedures should be thoroughly reviewed prior to the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all necessary equipment will be available at the jobsite.
Be sure to have a copy of the unit certified drawing available for reference. If you do not have a copy of this drawing
or if you need additional information about this unit, contact the local BAC Balticare representative. His name and
phone number can be found on the BAC website: www.BaltimoreAircoil.eu. The model type and serial number of
your equipment are indicated on the unit nameplate.
Recommended Maintenance and
Monitoring Programme
Checks and Adjustments
Adiabatic Pre-Cooler water flow
Adiabatic controller set-point
Tighten Electrical Connections
Rotation of fan(s)
Motor voltage and current
Unusual noise and/or vibration
Inspections and Monitoring
General condition of the equipment
Adiabatic pre-cooling pads
Heat transfer coil
Water distribution pipe
City water strainer
Cleaning Procedures
Adiabatic Pre-Cooling media
Adiabatic gutter system
Auxiliary equipment integrated in the cooling system may require additions to the table above. Contact
suppliers for recommended actions and their required frequency.
2
W W W . B A L T I M O R E A I R C O I L . E U
Start-Up
Every
Every 3
Month
Months
X
X
X
X
X
X
X
X
X
Start-Up
Every
Every 3
Month
Months
X
X
X
X
X
X
X
X
Start-Up
Every
Every 3
Month
Months
X
X
Every 6
Every Start of Adiabatic
Months
Season, Spring
X
X
X
X
X
X
X
Every 6
Every Start of Adiabatic
Months
Season, Spring
X
X
X
X
X
X
Every 6
Every Start of Adiabatic
Months
Season, Spring
X
X
X

Advertisement

Table of Contents
loading

Table of Contents