Download Print this page

Viessmann Vitodens 100-W Technical Data Manual page 26

Gas-fired wall-mounted condensing boiler 37 to 118 mbh/10.8 to 34.6 kw
Hide thumbs Also See for Vitodens 100-W:

Advertisement

Appendix
CPVC or Stainless Steel Vent System
1
Vent System
Vent System
Hybrid Vent System
Horizontal Intake / Vertically Vented
Room Air
Independent Operation
Independent Operation
B
b
a
a
1a
Stainless steel vent material must be ULC/UL listed, stainless steel AL29-4C® for Category IV boilers.
Suggested sources: Flexmaster Canada Ltd. / Z-Flex (US) Inc., Heat-fab, ProTech Systems Inc., or Security Chimneys Int'l.
1b
CPVC vent material must be ULC/UL listed, for Category IV boilers. Suggested source: IPEX Inc.
2
Boiler cannot support weight of vent system. Support venting as prescribed in vent manufacturer's installation instructions.
3
Combustion air supply pipe may be made of the following materials: ABS, CPVC, PVC, or stainless steel.
"
Do not include first 90° elbow in equivalent vent length calculations (this applies to all vent materials).
"
A maximum of 5 x 90° elbows may be installed in the air intake and flue outlet combined; do not exceed maximum equivalent vent length.
"
Always follow Viessmann venting installation instructions 5368 815.
26
I M P O R T A N T :
Do not use any DWV plumbing
pipes to vent this boiler.
A
A
Combustion Air Intake
B
Flue Gas Outlet
Vent System Diameter
Maximum Equivalent a + b
Length (EqL)
1 Boiler Vent Adaptor
2 Adaptor, for stainless steel
60/100 to 80/125
(outer shell removed)
2 Adaptor(s), CPVC
60mm to 2"
3 Adaptor(s), stainless steel
80mm to 3"
3" to 4"
(not shown)
3 Adaptor(s), CPVC
2" to 3"
3" to 4"
(not shown)
4 Venting Support
2
5 ULC/UL listed
Stainless Steel Vent Material
for EqL calculations, use:
H 45° Elbow EqL=2ft. / 0.6m
H 90° Elbow EqL=3ft. / 0.9m
or
5 ULC/UL listed
1b
CPVC Vent Material
for EqL calculations, use:
H 45° Elbow EqL=3ft. / 0.9m
H 90° Elbow EqL=5ft. / 1.5m
6 Adaptor(s), CPVC
60mm to 2"
7 2" to 3" or 2" to 4"
8 Combustion Air Intake Vent Material
Allowable materials: see note below
9 Bird Screen c/w
Termination
for stainless steel
or
9 Bird Screen (Set of 2)
for CPVC
2"
3"
4"
86 / 26
164 / 50
200 / 61
included with boiler
7424 112
7134 769
field
field
supplied
supplied
and
field
supplied
field
field
supplied
supplied
and
field
supplied
field supplied
field supplied
1a
field supplied
7134 769
field supplied
field supplied
3
field supplied
7134 780
7134 781
7134 782
Diameter
ft. / m
Order No.
Order No.
Order No.
Order No.

Advertisement

loading